Similar Projects
Riverton Park Selective Electrical Panel and Meter Replacement
Post-Bid
Portland, ME

125KW Portable Generator Rental
Post-Bid
Portland, ME

Barron Center Generator
Results
Less than $100,000 est. value
Portland, ME 04102

B7 Electrical Svc Upgrade & 2nd Floor Structural Spt
Results
$500,000 to $1,000,000 est. value
Kittery, ME 03904

Electrical Services
Post-Bid
Portland, ME

NCTCS Cutler Electrical Ductbank Relocation
Results
$5,000,000 to $10,000,000 est. value
Cutler, ME 04626

6515--Steam Generator Replacement for SPS Sterilizer SDVOSB Set-Aside Togus VAMC
Post-Bid
Augusta, ME 04330

UMPI Solar Array
Results
Presque Isle, ME 04769

Electricity: University of Maine
Post-Bid

Eaton Uninterrupted Power Supply (UPS) Preventive Maintenance (PM) and Battery Replacement
Results
Kittery, ME 03904

Install a Solar Electric System at the Winter Harbor Wastewater Treatment Facility
Post-Bid
Winter Harbor, ME

Athletic Field Electrical Service Project
Results
Bangor, ME 04401

Electrical Contractors
Post-Bid
Readfield, ME 04355

Portable Generator for Bramhall Fire Station
Results
Less than $36,500 est. value
Portland, ME 04102

York School Department Electrical Upgrades
Post-Bid
York, ME

Last Updated 04/04/2022 03:26 AM
Project Title

Wastewater Treatment Facility - Emergency Power Generator

Physical Address View project details and contacts
City, State (County) Bangor, ME   (Penobscot County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of offloading and installing two Owner-furnished parallel 750 KW natural gas stand-by power systems, automatic transfer switches and electrical switch gear, and construction of ancillary systems and site work to support the installation of the generators at the City of Bangor’s Wastewater Treatment Facility. Note that the new generator and associated electrical gear has been purchased directly by the City and will be delivered to the project site at which point the Contractor shall take ownership of the equipment, for installation, startup and testing.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents