Last Updated | 02/17/2021 08:49 AM |
Project Title | Capps Ferry Lift Station and Force Main |
Physical Address | View project details and contacts |
City, State (County) | GA (Douglas County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,313,122 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be performed shall include the Installation of approximately 17,000 linear feet of force main and building and start-up of a lift station, including generator and odor control system, as shown on the plans prepared by Hughes-Ray Company, dated November 18, 2020. The force main consists of approximately 8,000 feet of 12" and 9,000 feet of 16" Tnemec 431 lined ductile iron pipe, including approximately 1,000 feet of bored casing pipe. The Authority will provide all 12-inch and 16-inch ductile iron pipe for the Project. Additionally, approximately 1,100 feet of 2' PVC waterline will be installed as part of the Project. Portions of the Project will be on easements that will require clearing while other portions are on existing right of way. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |