Similar Projects
Project Silver
New Construction, Infrastructure
Conception
Douglasville, GA

Luella Storage
New Construction, Infrastructure
Conception
$9,000,000 est. value
Locust Grove, GA 30248

Circle K - Lawrenceville Hwy / Lawrenceville
New Construction, Infrastructure - 6,000 SF
Design
$1,400,000 CJ est. value
Lawrenceville, GA 30044

The Proctor
New Construction, Infrastructure - 142,000 SF
Design
$55,000,000 CJ est. value
Atlanta, GA 30318

MJ Taylor Road Rehabilitation/Resurfacing
Infrastructure
Bidding
$260,000 CJ est. value
Adel, GA 31620

AutoZone #0914 / Gainesville
New Construction, Infrastructure - 7,000 SF
Post-Bid
$1,500,000 CJ est. value
Gainesville, GA 30501

Electric Utility Right-Of-Way Clearing
Term Contract
Post-Bid
Covington, GA

NOWRF and MOWRF Tertiary Filtration
Results
Athens, GA

Duluth High School - Softball Stadium and Site Preparation
Results
Duluth, GA 30096

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

Winder Retail Center - Site
New Construction
Construction
Winder, GA

Brownsville Road Mixed-Use Development
New Construction, Infrastructure - 12,000 SF
Pending Verification
$48,000,000 CJ est. value
Powder Springs, GA 30127

17th Street Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Atlanta, GA 30363

Microsoft Data Center / Palmetto
New Construction, Infrastructure, Alteration
Conception
$27,000,000 est. value
Palmetto, GA 30268

Rowen Phase 1 Roads and Infrastructure
Infrastructure
Design
$18,000,000 est. value
Dacula, GA

Last Updated 08/31/2022 10:05 AM
Project Title

Water Treatment Plant Dechlorination System

Physical Address View project details and contacts
City, State (County) Toccoa, GA 30577   (Stephens County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,099,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

No Proposal may be withdrawn after the closing time for the receipt of Proposals for a period of sixty (60) days except as specifically provided in the Instructions to Offerors and/or by State Law. Bidder agrees to furnish all labor, materials, equipment, and any other appurtenances necessary to provide a new chemical feed system and chemical feed building as shown in the Drawings and as specified in the Contract Documents. Work to be performed includes, but is not limited to, mobilization/demobilization, bonds, insurance, taxes, grading, earthwork, gas chemical feed system, reinforced concrete, pre-fabricated FRP building, electrical, mechanical, piping, valves, painting, soil erosion and sediment control, and all other appurtenances necessary for completion of the work and to place the new process equipment into operation. Time allotted for substantial completion of work is 180 calendar days. All other questions may be directed to the issuing office, Carter & Sloope, Inc., Watkinsville, GA, 706-769-4119.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents