Similar Projects
Installation and Construction of Production Well PW-1
Infrastructure
Bidding
Plattsburgh, NY

Backup Water Supply Plains Road Well House Construction - Phase 3
Infrastructure
Bidding
New Paltz, NY 12561

Furnish Hidrostahl Submersible Pump at Thomas Creek Pump Station
Post-Bid
Fairport, NY 14614

Installation of Well Pump Well 2
Post-Bid
Beacon, NY 12508

Merriewold Wellfield Improvements
Results
Blooming Grove, NY 10914

Fire Pump Base Replacement
Results
Comstock, NY 12821

Creamery Wellhouse Renovation Project
Infrastructure
Bidding
Hartwick, NY

Sewage Pumps
Post-Bid
Cortlandt Manor, NY 10567

Replace Relief Wells at Portville Flood Control Project
Results
$1,000,000 to $2,000,000 est. value
Portville, NY 14770

Water Pumps and Motors Maintenance and Repair
Term Contract
Bidding
Yonkers, NY

Repair WEMCO Pump
Post-Bid
White Plains, NY 10601

New York State Office of Mental Health, Hutchings Psychiatric Center, Site Manhole Sump Pump Replacement
Results
Syracuse, NY 13210

Pump
Post-Bid
White Plains, NY 10601

Maintenance Contract for the Town of Bethlehem Well Pumping Systems
Term Contract
Results
Delmar, NY 12054

Pumps, Pump Parts and Accessories for Heating and Cooling Applications as Specified
Term Contract
Post-Bid
Syracuse, NY 13202

Last Updated 08/12/2021 08:50 AM
Project Title

Henry Street Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Glens Falls, NY   (Warren County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work generally includes: 2,155 LF of 6-inch HDPE Forcemain by direction drilling, open cut and cured in place lining; 805 LF of 8 inch gravity sewer; 270 LF of 24-inch storm sewer; 2,200 LF of 36-inch, 8-inch, 12-inch and 18-inch cured in place lining and manhole rehabilitation. Work also includes installation of two air release structures and an ultrasonic flow meter.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents