Similar Projects
State Street MPI Paving
Infrastructure
Bidding
$1,025,000 est. value
Portland, ME 04101

Road Resurfacing, Reclamation, and Other Road Repair Services
Post-Bid
Portland, ME

Crack Sealing Services
Term Contract, Infrastructure
Post-Bid
Portland, ME

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Less than $1,258,000 est. value
South Portland, ME 04101

Interstate 295 Southbound Over State Route 703 and Interstate 295 Southbound Over Westbrook Street Bridge Joints
Results
Less than $1,677,000 est. value
South Portland, ME 04106

Repair Pavement Main Entrance South Portland Air National Guard Station (SPANGS)
Infrastructure
Post-Bid
$47,000 est. value
South Portland, ME 04106

Andrews Square Intersection Improvements
Results
$400,000 est. value
Portland, ME

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Gravel Road Construction
Results

2022-2023 Bituminous Concrete and Paving Related Services
Term Contract
Post-Bid
Westbrook, ME

Kennebec Street Corridor Improvements
Results
Less than $376,000 est. value
Portland, ME 04101

Furnish Paving & Other Road Repair Services
Infrastructure
Post-Bid
$100,000 est. value
Portland, ME

Somerset Street Restoration
Results
Less than $929,000 est. value
Portland, ME 04101

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements - Portland - Region 1
Infrastructure
Post-Bid
$2,000,000 est. value
Portland, ME 04103

Exit 45 Interchange Reconfiguration Mile 44.9
Results
Less than $28,600,000 est. value
Portland, South Portland, ME

Reported 06/13/2022 04:09 PM
Project Title

Morrills Corner - State Route 302 and 100

Physical Address View project details and contacts
City, State (County) Portland, ME 04101   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Obtained from a Public Office, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction of Forest Avenue, Allen Avenue, Stevens Avenue and Warren Avenue Intersection. As of June 10, 2022, this project is included City of Portland FY 2021-2025 CIP. Information regarding design firm and general contractor selection has not been disclosed. A firm construction timeline has not been released.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents