Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Intersect Modif
Infrastructure
Design
$8,000,000 CJ est. value
El Reno, OK 73036

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

137th Backflow Repair
Term Contract
Post-Bid
Oklahoma City, OK

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Waterline Replacement - Memorial Road and Lake Hefner Parkway
Infrastructure
Results
$875,000 est. value
Oklahoma City, OK

OKC Zoo Water Line Extension
Infrastructure
Results
$500,000 est. value
Oklahoma City, OK

NW 10th @ The Stack
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Yukon, OK 73099

Eagles Glen
New Construction, Infrastructure
Pending Verification
$12,910,000 CJ est. value
Oklahoma City, OK 73099

Flour Mill & Coop Mill Redevelopment / Yukon Technology Center
Demolition, New Construction, Infrastructure, Renovation - 476,920 SF
Design
$120,000,000 CJ est. value
Yukon, OK 73099

Forster Drive Waterline Relocation
Infrastructure
Post-Bid
$200,000 est. value
Mustang, OK 73064

Waterline Replacement
Infrastructure
Results
$2,216,905 est. value
Oklahoma City, OK

The Community at Surrey Plaza
New Construction, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Oklahoma City, OK 73099

Grade, Drain and Surface - SH 4
Infrastructure
Design
$12,360,000 CJ est. value
Yukon, OK 73099

High School Baseball/ Softball Turf
Infrastructure
Post-Bid
$1,800,000 CJ est. value
Yukon, OK 73099

Last Updated 02/17/2023 06:32 AM
Project Title

Utilities - US 270

Physical Address View project details and contacts
City, State (County) El Reno, OK 73036   (Canadian County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $272,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us-270: From the Kingfisher C/l in Geary, Ext East Appx 11 Miles to Calumet Then South Appx 5 Miles to I-40 (Ut). As of February 17, 2023, the project is in Design status. Anticipated letting month/year is August, 2025. Length : 16.000 Mi OKDOT - Utilities - US 270 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents