Similar Projects
66” Siphons, 96” Interceptor and Almond Creek River Crossing Cleaning Project
Post-Bid
$824,000 est. value
VA 23219

Linville Creek Stream Restoration Project at Heritage Park
Post-Bid
$200,000 to $310,000 est. value
Broadway, VA 22815

Roberts Road Improvements
Results
$630,757 est. value
Fairfax, VA

Restoration Project of Accontick Creek
Results
Fairfax, VA

Drainage Improvement Project Lakecrest Court and Greenlee Road
Post-Bid
Roanoke, VA

Sandy Run Regional Park Shoreline Stabilization
Results
$25,000 est. value
Fairfax Station, VA

Warsaw Downtown Revitalization Project
Post-Bid
Warsaw, VA 22572

Columbia Drive Restoration
Results
VA

Massanetta Springs Road (SR 687) Improvement Project
Results
$2,177,572 est. value
Harrisonburg, VA 22802

Pedestrian and Drainage Project
Results
$4,467,755 est. value
Fairfax, VA

Pickett Shopping Center Roadway Improvements Project
Results
$262,153 est. value
Fairfax, VA 22030

Hope Drive Extension
Results
$2,772,000 est. value
Winchester, VA 22601

Smart Scale Intersection Improvements
Results
Less than $4,111,000 est. value
VA

Y--Hidden Pond Trail Resurfacing
Results
Lorton, VA 22079

Full Depth Reclamation and Asphalt Resurfacing
Results
Blacksburg, VA

Last Updated 11/22/2019 04:24 PM
Project Title

Buena Vista Industrial Park Access Road and Utilities Phase I

Physical Address View project details and contacts
City, State (County) Buena Vista, VA 24416   (Buena Vista City County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Includes constructing approximately 700 linear feet of paved roadway, 600 linear feet of 10” waterline, 1,850 linear feet of 10” sanitary sewer, ten manholes, and 400 linear feet of 54” stormdrain. Price shall encompass a complete project, per the plans and specifications, to include but not limited to, mobilization; permits; erosion and sediment control; demolition; trenching, sheeting, shoring and dewatering; bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring (both public and private); temporary patching and permanent pavement; reestablishment of green areas and landscaping; testing; traffic control, coordination with an adjacent project, and all elements necessary to complete the Work in a complete and first class manner.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Underwater Construction, Underwater Pipeline Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents