Similar Projects
Resorts World Miami
New Construction, Renovation
Design
Miami, FL 33132

LMI Milton Roy Metering Pump
Post-Bid
Tampa, FL 33602

Jet Water Pump Replacement
Post-Bid
Orlando, FL 32826

Sarasota FL Manasota P&DC Security
Results
$1,500,000 to $1,600,000 est. value
Manasota, FL 34260

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

Cleaning of Well at Highland Village
Post-Bid
North Miami Beach, FL 33162

Construction Manager at Risk, Northwest Water Reclamation Facility
Results
Less than $29,000,000 est. value
Saint Petersburg, FL 33710

Atlantic/Brentwood Deep Injection Well, IW-1 Acidization and Rehabilitation
Post-Bid
Less than $250,000 est. value
Sarasota, FL 34230

Rental, Pump Equipment
Term Contract
Results
$1,250,000 est. value
FL

SDWWTP Plug and Abandon FA Monitoring Wells and Install / Replacement of FA Wells
Post-Bid
Less than $3,810,945 est. value
Cutler Bay, FL 33190

Regional Facility Site Pump Station Expansion Project
Results
$2,168,480 est. value
Clearwater, FL 33763

Pump
Post-Bid
Lakeland, FL 33801

South Hillsborough Aquifer Recharge Expansion
Results
$1,643,200 est. value
Tampa, FL 33600

Removal, Repair and Re-Installation of Two Vertical Single End Suction Axial Flow Pumps and Right-Angle Gear Drives
Post-Bid
Coral Springs, FL

N--Services: Replace Chilled Water Pumps (Service Only - Pumps/Motors Supplied)
Results
Miami, FL 33125

Last Updated 01/10/2020 08:15 AM
Project Title

Southern Regional Water Reclamation Facility Supplemental Well

Physical Address View project details and contacts
City, State (County) Orlando, FL 32819   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes construction of an 18-inch diameter well to provide supplemental flow to reclaimed water.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents