Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Noble Hall Controls Upgrade
Alteration
Bidding
Greensboro, NC 27497

Hazmat Storage Building Electrical Modifications
Post-Bid
Greensboro, NC 27400

Service Agreement for Nitrogen/Hydrogen Generators
Post-Bid
Greensboro, Raleigh, NC 27603

HVAC Electric Motor and Pump Repair Services
Results
Greensboro, NC 27401

Cable Wire
Results
Greensboro, NC

Fairfield Substation Equipment - Electric Dept
Post-Bid
High Point, NC

Gtcc Auto Body Building Generator Power
Results
Jamestown, NC 27282

Uninterruptable Power Supply Replacement
Alteration
Post-Bid
$50,000 est. value
Summerfield, NC 27358

Enclosure 11"X18"X12" in-Ground
Results
Greensboro, NC

Electrical Installation, Maintenance and Repairs - 21
Term Contract
Post-Bid
Greensboro, NC

Standby Generator System for Central Energy Plant
Alteration
Results
$55,036 est. value
Jamestown, NC

Hanger Fans
Term Contract
Post-Bid

LED Upgrades at 1510 Walker Avenue and Curry Building Auditorium
Alteration
Results
Greensboro, NC 27403

Uninterruptible Power System
Alteration
Post-Bid
Greensboro, NC 27401

Last Updated 02/24/2022 06:14 PM
Project Title

Replacement of Summerfield 800 MHz Tower Lighting System

Physical Address View project details and contacts
City, State (County) Summerfield, NC 27358   (Guilford County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of Summerfield 800 MHz Tower Lighting System, located at 5501 Centerfield Road, Summerfield, NC 27358. The scope of this project includes the following: Review existing tower structural inspection report from Allstate Tower, Perform site visits and observations to validate unknown items from the Allstate Tower structural report, Conduct any testing required to provide scope of work for the new lighting system, Perform assessment with visual and/or necessary testing , Determine if the 660-foot tower can now be a medium intensity LED lighting system versus the strobe system that is currently present, Provide report with findings and proposed solutions to replace the tower lighting system, Provide scope of work to execute the replacement of the tower lighting system, Provide estimated schedule to complete the replacement of the tower lighting system, Provide estimate of probable cost to perform the replacement of the tower lighting system, and Take any information needed to make informed engineering determinations for replacing tower lighting system.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents