Similar Projects
New Wastewater Treatment Plant
New Construction
Conception
Milton, FL

Northwest Wastewater Plant Operations Building
New Construction - 1,500 SF
Design
$8,000,000 to $10,000,000 est. value
Tampa, FL

Design-Build for South County Advanced Wastewater Treatment Facility Expansion
Addition
Bidding
$50,000,000 est. value
FL

Chemical System Upgrade
Alteration
Bidding
Marathon, FL

Greenland Water Reclamation Facility (WRF)
Sub-Bidding
$100,000,000 est. value
Jacksonville, FL 32202

Wastewater Treatment Facility Improvements Phase 1
Post-Bid
Less than $4,900,000 est. value
Davenport, FL

Port Labelle Utility System Wastewater Treatment Plant Improvements
Renovation
Post-Bid
LaBelle, FL 33935

Construction Manager at Risk Services - Embassy Hills Wastewater Treatment Plant Rehabilitation and Improvements
Results
$585,000 est. value
Port Richey, FL 34668

Construction of Vactor Dump Site WRF#2
Results
Ocala, FL 34471

New Headworks and Grit Removal Facility
Construction
$11,900,000 est. value
Clearwater, FL 33756

CR 136/I-75 Wastewater Treatment Plant
Construction
Less than $1,365,194 est. value
FL

Construction Package ST-2D-A South District Wastewater Treatment Plant Electrical Distribution Building 3
New Construction
Bidding
$106,686,636 est. value
Homestead, FL 33032

NCWRF EQ #3 Odor Control Improvements - Phase 1 Construction
New Construction
Post-Bid
$815,000 est. value
Naples, FL 34109

Design-Build GT LOHMEYER WWTP Replacement of Oxygen System Projects 11781 and 11917
Results
Fort Lauderdale, FL 33316

South Martin Regional Wastewater Treatment Plant Filter and Chlorine Contact Basin Improvements
Construction
Hobe Sound, FL 33455

Last Updated 10/22/2021 10:31 AM
Project Title

Arlington East WRF Secondary MCC Replacement Project

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32225   (Duval County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, materials, and equipment to complete necessary structural modification of the existing control building, demolition of existing electrical and control equipment, and installation of the new electrical and control equipment at the Arlington East Water Reclamation Facility

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents