Similar Projects
Horse Soldier Farms
New Construction
Conception
$200,000,000 est. value
Somerset, KY

Lueberry Acai
Build-Out
Conception
Saint Matthews, KY 40207

Murphy USA #5750
New Construction, Demolition - 1,400 SF
Conception
$500,000 to $1,000,000 CJ est. value
Shelbyville, KY 40065

Murphy USA #7213
New Construction, Demolition - 1,400 SF
Conception
$500,000 to $1,000,000 CJ est. value
Owensboro, KY 42303

Widen I-71 From Four to Six Lanes From KY-393
Infrastructure
Conception
$40,000,000 CJ est. value
Crestwood, KY 40014

Address Pavement Condition
Infrastructure
Conception
$5,500,000 CJ est. value
Elizabethtown, KY 42701

Address Pavement Condition
Infrastructure
Conception
$3,250,000 CJ est. value
Elizabethtown, KY 42701

Newtown Springs Lot 3 Restaurant
New Construction
Conception
$1,500,000 est. value
Lexington, KY 40511

Old Schoolhouse Lane Subdivision
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Lexington, KY 40513

Reconstruct Between KY 120 and RR Bridge
Infrastructure
Conception
$1,360,000 CJ est. value
Slaughters, KY 42456

Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Publix Super Market at Marshall Commons / Louisville
New Construction, Infrastructure - 58,501 SF
Conception
$15,000,000 CJ est. value
Louisville, KY 40241

Freddy's Steakburgers / Florence
New Construction
Conception
$600,000 est. value
Florence, KY 41042

Address Pavement Condition of PCC Pavement on I-24 Both Direction(S)
Infrastructure
Conception
$6,500,000 CJ est. value
Hopkinsville, KY 42240

Address Pavement Condition of I-75 Non-Cardinal Direction(S)
Infrastructure
Conception
$1,250,000 CJ est. value
Williamstown, KY 41097

Last Updated 06/15/2023 12:27 PM
Project Title

Murphy Oil #6730/7878 / Monticello

Physical Address View project details and contacts
City, State (County) Monticello, KY 42633   (Wayne County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the demolition of an existing structure and the construction of a new gas station/convenience store. As of June 15, 2023, a general contractor has been selected. Construction is anticipated to commence August 2023. Direct all bids/inquiries to the GC bidders. The owner requests no email or phone inquiries. Addendum #1 has been issued as of 5-17-2023. Revisions to Utility Plan Sheet C-7 – Utility Plan o Added note indicating size and type of existing water main along Kentucky Hwy. 90 o Clarified tapping sleeve size on fire hydrant assembly Gaven Ballinger

Details

1 Story Above Grade, 2,800 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents