Similar Projects
New Huntington Middle School & Community Center
New Construction
Conception
$57,000,000 est. value
Newport News, VA

Route 1 Elementary School - Fairfax County Public Schools
New Construction, Infrastructure
Conception
$21,169,000 CJ est. value
Mount Vernon, VA 22309

Future Western High School
New Construction
Conception
$157,707,000 est. value
VA

Silver Line Elementary School - Fairfax County
New Construction, Infrastructure
Conception
$57,992,500 CJ est. value
Fairfax, VA 22030

Cub Run Elementary School - Fairfax County
New Construction, Infrastructure
Conception
$61,400,000 CJ est. value
Centreville, VA 20120

Public Schools - Union Mill Elementary School - Fairfax County
Renovation
Conception
$57,700,000 CJ est. value
Clifton, VA 20124

Centre Ridge Elementary School - Fairfax County
New Construction, Infrastructure
Conception
$55,800,000 CJ est. value
Centreville, VA 20121

Poplar Tree Elementary School Renovations
Renovation
Conception
$39,560,735 est. value
Chantilly, VA 20151

Public Schools - Waples Mill Elementary School - Fairfax County
Renovation
Conception
$56,100,000 CJ est. value
Oakton, VA 22124

Public Schools - Sangster Elementary - Fairfax County
Renovation
Conception
$55,000,000 CJ est. value
Springfield, VA 22153

Public Schools - Saratoga Elementary School - Fairfax County
Renovation
Conception
$58,900,000 CJ est. value
Springfield, VA 22153

Public School - Virginia Run Elementary School - Fairfax County
Renovation
Conception
$56,000,000 CJ est. value
Centreville, VA 20120

Franklin Middle School Renovations
Renovation
Conception
$71,411,764 est. value
Chantilly, VA 20151

Twain Middle School Renovations
Renovation
Conception
$70,106,633 est. value
Alexandria, VA 22310

Elementary School Renovations
Renovation
Conception
$25,000,000 est. value
VA

Last Updated 02/23/2023 04:41 PM
Project Title

Central High School & Lawson Marriott Elementary School Bathroom Remodels

Physical Address View project details and contacts
City, State (County) King George, VA 22485   (King George County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK: The purpose of this Request for Proposal (RFP) is to solicit proposals for a contractor to renovate a bathroom at Central High School and Lawson Marriott Elementary School. Inquiries regarding the technical aspects of this need and the bidding procedures of this solicitation should be directed to Emma L. Hundley, Chief Financial Officer at (804) 785-5981. BACKGROUND King and Queen County Public Schools is approximately 640 student rural school division with two PK-6 grade elementary schools and one grade 7-12 high school. Central High School currently has approximately 275 students attending in grades seven through twelve. Lawson Marriott Elementary School currently has approximately 195 students attending in grades Pk-6. PURPOSE The School Board is accepting proposals for a contractor to renovate a bathroom at Central High School and a bathroom at Lawson Marriott Elementary. The selected contractor will provide the School Board with professional services to realize the successful implementation of all aspects of the scope of work. SCOPE OF WORK Lawson Marriott Elementary - 1599 Newtown Rd, St. Stephens Church, VA 23148: Remodel/upgrade of existing restroom across the hall from the main office in order to provide an updated and fully functional restroom facility. o Redesign of restroom to include a minimum of two partitioned toiled staffs and two urinals with privacy panels o New tile on floors and walls (from floor to ceiling or to existing line) o Installation of drop ceiling o Replace existing light fixtures with LED flat panel fixtures o Install new toilets, urinals and sinks o If sink supply and drains are exposed, install safety covers o Install new touchless, automatic flush valves and faucets o Install new trap piping, supply valves, floor drain covers and clean out covers o Install new toilet and urinal flanges as needed o Replace in-room, cold water spigot o Replace in-room, wall mounted heater o Repair/replace existing exhaust fans o Install shatterproof safety mirrors o Paint walls o To include all labor and materials to complete the project o To include any and all demolition and debris removal Central High School - 17024 The Trail, King & Queen CH, VA 23085: Remodel/upgrade of existing restroom located on the main hall in order to provide an updated and fully functional restroom facility o New tile on floors and walls (from floor to ceiling or to current line) o Replace existing ceiling tile o Replace existing light fixtures with LED flat panel fixtures o Replace existing toilet partitions o Install new urinal partitions o Install new toilets, urinals, and sinks o If sink supply and drains are exposed, install safety covers o Install new touchless automatic flush valves and faucets o Install new trap piping, supply valves, floor drain covers and clean out covers o Install new toilet and urinal flanges as needed o Replace in-room, cold water spigot o Repair/replace existing exhaust fans o Install shatterproof safety mirrors o Paint walls o To include all labor and materials to complete the project o To include any and all demolition and debris removal PROPOSAL REQUIREMENTS A. Proposals should include a brief description of the firm, including firm history, expertise, and organization structure. B. Proposals shall be signed by an authorized representative of the firm. By submitting a proposal, the firm certifies that all information provided in response to this RFP is true and accurate. Failure to provide information required by this RFP will ultimately result in rejection of the proposal. C. A list of three past and current clients. Include name, address, phone number and a provide a brief description of the services provided and dates of service. D. Proposals should be prepared simply and economically, providing a straightforward, concise description of the proposer capabilities for satisfying the requirements of the RFP. E. Timeline of project. F. The Respondent's proposal shall include: the completed and signed RFP cover page; One (1) manually signed original and four (4) copies of the proposal shall be submitted. Each copy of the proposal shall be bound in a single volume where practical. G. As part of the proposal contractors and subcontractors must meet the Davis-Bacon Act prevailing wage requirements and will be required to show proof if necessary. H. Any information thought to be relevant, but not specifically applicable to the enumerated scope of work, may be provided as an appendix to the proposal. I. Proposals should include the itemized cost of the two locations separately. (i.e. Lawson Marriott project itemized cost $$$ and Central High School itemized project cost $$$). EVALUATION PROCESS King and Queen County Public Schools will use the competitive negotiation process (as outlined in the Virginia Procurement Act, specifically ( 2.2-4301 and 2.2-4302.2). AWARD OF THE CONTRACT The School Board shall reserve the right to negotiate with any company/supplier submitting a response to alter, clarify, or further enhance the company's proposals and/or any contract arising out of the acceptance of the response. METHOD OF PAYMENT Invoices shall be submitted directly to Accounts Payable. You may submit invoices electronically to mgonzalez@kqps.net or mail them to: King and Queen County Public Schools Attn: Accounts PayableP.O. Box 97 King and Queen C.H., VA 23085.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents