Similar Projects
Septic Access Cover Project
Infrastructure
Design
Houlton, ME 04730

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements in the Towns of Ashland
Infrastructure
Bidding
$4,000,000 CJ est. value
Ashland, ME 04732

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements in the Towns of Ashland
Infrastructure
Bidding
$4,000,000 CJ est. value
Ashland, ME 04732

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Winter Road Maintenance for the West Side of Eagle Lake and Plaisted
Infrastructure
Post-Bid
Eagle Lake, ME

Statewide Geotechnical Drilling
Infrastructure
Results

Pavement Grooving and Polyurea Painting/Located on Interstate I95 and 95, various locations
Infrastructure
Results

1-GW King Pine Wind Generation Project
Infrastructure
Pending Verification
$2,000,000,000 CJ est. value
Portage Lake, ME 04768

2022 Paving
Infrastructure
Post-Bid
Presque Isle, ME

Crack Sealing/Priority 1
Infrastructure
Results
ME

2022 Chip Seal
Infrastructure
Post-Bid
Presque Isle, ME

Harris Hill Road
Infrastructure
Results
Weston, ME 04424

Asphalt Street Paving
Infrastructure
Post-Bid
Houlton, ME

Paving Old Main Street
Infrastructure
Results
Eagle Lake, ME 04739

Snow Plowing
Term Contract
Post-Bid
Haynesville, ME

Last Updated 05/03/2023 05:32 AM
Project Title

(LCP)Light Capital Paving - Presque Isle Area - Region 5

Physical Address View project details and contacts
City, State (County) Presque Isle, ME 04769   (Aroostook County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,882,839 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The lowest responsive bidder must have completed, or successfully complete, a Highway Construction or Paving Prequalification, or project specific prequalification to be considered for the award of this contract. Description: WIN 25885.00 Location: In Aroostook County, project is located: Map ID 1 is in Mapleton, Castle Hill, and Washburn on the Castle Hill Road beginning at the intersection with Route 227 and extending northerly to Route 164. Includes paving shoulders Map ID 2 is in Washburn on Route 164 beginning 0.06 of a mile east of the intersection with School Street and extending northerly to the intersection with the Carson Road. Includes paving shoulders. Map ID 3 & 4 is in Castle Hill, Mapleton, & Presque Isle on the Route 227 beginning 0.74 of a mile northeast of the Turner Road and extending easterly to the intersection with Route 163 Including all spurs connecting Route 227 to Route 163. Includes paving shoulders. Map ID 5 is in Caribou on the West Gate Road beginning at Route 89 and extending northerly to the intersection with Nebraska Road. Includes milling and paving Bridge# 5625. Includes paving shoulders. Map ID 6 is in Limestone on the East Gate Road beginning at Route 89 and extending northerly 0.72 miles. Map ID 7 is in Easton and Presque Isle on Route 10 beginning O .22 of a mile west of the Bangor Road and extending westerly to the intersection with the Conant Road. Includes milling and paving Bridge# 3259 & 2687. Includes paving shoulders. Map ID 8 is in Presque Isle and Easton on the Conant Road beginning at the intersection with Route 10 and extending easterly to .03 miles west of the intersection with Station Road. Includes paving shoulders. Outline of Work: Light Capital Paving and other incidental work. Total length is 3 3 .18 miles For general information regarding Bidding and Contracting procedures, contact George Macdougall at (207) 624-3410. For Project-specific information fax all questions to Tim Pelotte at (207) 624: 3431, use electronic RFI form or email questions to RFI-Contracts MDOT@maine.gov, project name and identification number should be in the subject line. Questions received after 12:00 noon of Monday prior to bid date will not be answered. Bidders shall not contact any other Departmental staff for clarification of Contract provisions, and the Department will not be responsible for any interpretations so obtained. TTY users call Maine Relay 711. Each Bid must be made upon blank forms provided by the Department and must be accompanied by a bid bond at 5% of the bid amount or an official bank check, cashier's check, certified check, certificate of deposit, or United States postal money order in the amount of 5% of the bid amount, payable to Treasurer, State of Maine as a Bid guarantee. A Contract Performance Surety Bond and a Contract Payment Surety Bond, each in the amount of 100 percent of the Contract price, will be required of the successful Bidder. This Contract is subject to all applicable State Laws. The right is hereby reserved to the Maine DOT to reject any or all bids. MEDOT - (LCP)Light Capital Paving - Presque Isle Area - Region 5 Bids will be accepted from all bidders. Electronic bids do not have to be accompanied by paper bids. Please note: the Department will accept a facsimile of the bid bond; however, the original bid bond must then be received at the MDOT Contract Section within 72 hours of the bid opening. Until further notice, dual bids (one paper, one electronic) will be accepted, with the paper copy taking precedence.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents