Similar Projects
Dows Lane Culvert Replacement Project
Infrastructure
Post-Bid
Irvington, NY 10533

Webster Avenue Drainage Project, Phase II
Infrastructure
Post-Bid
New Rochelle, NY 10805

Webster Avenue Drainage Improvements - Washington Avenue to Lockwood Avenue
Results
New Rochelle, NY 10801

Phase V Construction of Open Space Recreation Area - 178 Warburton at the Ridgeway Infrastructure Improvements
Results
Yonkers, NY 10701

Regional Drainage and Culvert Cleaning (Statewide)
Term Contract, Infrastructure
Post-Bid

Glover Field Culvert Replacement Project
Results
Pelham, Pelham Manor, NY 10803

Beechwood Avenue and 2nd Street Drainage Improvements
Infrastructure
Post-Bid
New Rochelle, NY 10801

Cured-In-Place Pipelining - Term Construction Contract 7
Results

City Hall Employee Entrance Improvements
Infrastructure
Post-Bid
New Rochelle, NY 10801

Roadway Rehabilitation and Drainage Improvements - Tuttle Road
Results
Briarcliff Manor, NY

Catch Basin Repairs Sawmill River Parkway
Results
Less than $1,300,000 est. value
Greenburgh, Mount Pleasant, New Castle, NY

Ductile Iron Pipe
Results
Yonkers, NY

Culvert Job Order Contract: NYSDOT Region 8
Results
$1,200,000 est. value

Reconstruction of Drainage Systems on Plymouth Road - 2021
Results
NY

Bulkley Drain Rehabilitation
Results
Less than $800,000 est. value
Port Chester, NY

Reported 03/30/2022 12:00 AM
Project Title

Pleasantville UFSD Parking Lot Retaining Wall

Physical Address View project details and contacts
City, State (County) Pleasantville, NY 00401   (Westchester County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and disposal of existing retaining wall, chain link fencing, asphalt and all construction related debris. Existing guiderail is to be removed and re-installed on 6 IN by 8 IN pressure treated posts set 36 IN deep in 12 IN concrete filled Sono tubes. All areas of asphalt that are required to be removed shall be cut straight and repaved with 2 IN of binder material and 2 IN of topcoat over 6 IN of properly compacted Item 4 and joints heat sealed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents