Similar Projects
Art In Motion Charter School
Renovation, Addition - 111,000 SF
Conception
Chicago, IL 60649

Jesuit Academy Expansion
New Construction, Addition, Demolition, Alteration - 50,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Chicago, IL 60644

New Hope Academy Expansion
Build-Out - 9,600 SF
Design
Arlington Heights, IL 60004

2022 Additions and Renovations at Prairie Junior High School
Renovation, Addition
Bidding
$1,250,000 to $1,300,000 est. value
Alsip, IL 60803

Kennedy High School ADM
Renovation
Bidding
$100,000 to $250,000 est. value
Chicago, IL 60638

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Phase IV Group 1 STR
Results
Chicago, IL 60634

Phase IV Group 3 STR
Results
Chicago, IL 60607

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

Edward Tilden Career Community Academy High School - LBP Mitigation Surface Gym
Renovation
Bidding
$4,000,000 est. value
Chicago, IL 60609

Maine South High School
Post-Bid
Park Ridge, IL

Phase IV Group 4 STR
Results
Chicago, IL

2021 Summer Work
Renovation, Addition
Post-Bid
Winnetka, IL 60093

ROF at Davis Elementary School and Madero Middle School
Results
Chicago, IL 60632

Last Updated 06/01/2022 09:21 AM
Project Title

Central MS 2022 Toilet Room

Physical Address View project details and contacts
City, State (County) Evergreen Park, IL 60805   (Cook County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the removal and replacement of existing toilet room fixture finishes, lighting, doors, plumbing and related construction. The project will have two phases. Phase One will work will be completed over the Summer of 2022. Phase Two work will be completed over the Summer of 2023. Order Complete Printed Documents (Important Pa

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents