Similar Projects
Sabine Neches Waterway PA8 Containment Dike Raise
Design
$1,000,000 to $5,000,000 est. value
TX

Nueva Street Marina Fabridam Replacement
New Construction
Bidding
$435,000 est. value
San Antonio, TX 78275

Lake Dam Improvements
Renovation
Bidding
$7,800,000 to $8,100,000 est. value
Austin, TX 78744

Construction: Lewisville Spillway
Post-Bid
$25,000,000 to $100,000,000 est. value
Lewisville, TX

Z2PZ--Rebuilding of Gate 4 Support Systems and Opener at Waco
Post-Bid
Waco, TX 76711

Tom Miller Dam Replacement Chains
Results
Less than $175,000 est. value
Austin, TX

Dam Reconstruction at Bastrop State Park
Results
$7,500,000 to $8,300,000 est. value
Bastrop, TX 78602

Elm Creek (Cen-Tex) Watershed – Sites 37, 38 and 43 Repairs
Bidding
$500,000 to $750,000 est. value
Temple, TX

Lower Bois d'Arc Creek Reservoir Dam and Intake Project - Proposal Package 4A CR2700 Improvements
Post-Bid
$750,000 est. value
Honey Grove, TX 75446

Lane City Dam Interim Stabilization
Results
Lane City, TX 77453

Lower Bois D`Arc Creek Reservoir Dam and Intake Project - Proposal Package 3 Reservoir Cleanup
Post-Bid
$750,000 est. value
Honey Grove, TX 75446

Houston Ship Channel, Mid Bay Placement Area (PA) Improvements
Results
$5,000,000 to $10,000,000 est. value
TX 77571

Sister Grove Regional Water Resource Recovery Facility Outfall Pipeline 1 - Solicitation Set 01 - Large Diameter Tunnel Work and Large Diameter Pipe Materials
Post-Bid
TX

Houston Ship Channel, Texas, Clinton Placement Area Improvements in Harris County, Texas
Results
$5,000,000 to $10,000,000 est. value
Houston, TX 77002

LBCR Dam and Intake Project - Proposal Purchase Package 6B - Barrier and Warning System
Post-Bid
$350,000 est. value
Honey Grove, TX 75098

Last Updated 02/06/2020 08:35 AM
Project Title

DR2003 Riverbend Country Club Spillway Repairs

Physical Address View project details and contacts
City, State (County) Sugar Land, TX 77479   (Fort Bend County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $90,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project scope comprises the repair of the spillway washout, which created a large void approximately six feet deep at the bottom of the bulkhead and the repair of the washouts on the side slopes adjacent to the bulkhead. The scope of work includes the filling of the void(s) with grout to restablish the slope in front of the bulhead or weir structure at the Riverbend Country Club (RBCC). An area of approximately 450 Square Feet. The RBCC is located near the intersection of Dulles Ave. and Avenue E. The project is in the middle of the RBCC, just next to Green 11. The project requires the crossing of one bridge with limited weight capacity of 3 cubic yard and another narrow bridge with a capacity of 4 cubic yard. The contractor needs coordinated with the golf course manager during construction. Any damage to the cart paths and landscaping, has to be repair to existing condition by the contractor in coordination with the Country Club.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents