Project Title | Oxmoor Valley Community Parking Lot Expansion - Rebid |
Physical Address | View project details and contacts |
City, State (County) | Birmingham, AL 35211 (Jefferson County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding Closed, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $414,058 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bids are to be submitted in duplicate on the Proposal Form provided with specifications. No pre-qualification of bidders will be conducted prior to receiving bids. Under the Alabama State Code, Section 39-2-4, as amended by Act #2017-279, it is required for any contract exceeding $50,000 that the Bidder submit with his bid, either a cashier's check, drawn on an Alabama bank, or a bid bond, executed by a surety authorized and qualified to make bonds in Alabama, payable to the City of Birmingham, in an amount (subject to a maximum of $10,000.00) equal to five percent (5%) of the bid. In order for a bid to be considered, it must be accompanied by an acceptable bid bond or cashier's check. Any bid submitted for an amount of $50,000 or more, the bidder must be a licensed general contractor in the State of Alabama in accordance with Section 34-8, of the Alabama State Code. Contractor's license number shall appear on the outside of the envelope used to submit bid. A Performance Bond in the amount of 100% of the contract amount and a Statutory Labor and Material Payment Bond in the amount of 100% of the contract amount will be required from the successful bidder at the signing of the contract. Also, proof of insurance will be required when the contract is signed. The City will review bonds and insurance and execute the contract within twenty (20) days unless the successful contractor agrees to an extension in writing. Bidders are expected to prepare their bid to include all necessary material, labor, bonds, permits, overhead, profit, taxes, insurance, etc. costs. It is not the City's obligation to bring mistakes/omissions in bid to bidder's attention. If after bid opening, a bidder determines he has a mistake in bid, he may seek withdrawal of his bid without forfeiting his bond, if the request is in writing within three (3) work days after the bid opening, and is accompanied by clear and convincing evidence of the mistake. All cashier's checks or bid bonds will be returned immediately after bids are checked and tabulated to all except the three (3) lowest bona fide bidders. Bid bonds shall be returned to the three (3) lowest bonafide bidders when the contract is signed and performance and payment bonds and insurance are furnished by the successful bidder. If award is not made within fifteen (15) days after bid opening, all bid guarantees will be returned except for those of the potentially successful bidders. If after sixty (60) days, no award has been made, all bids shall be rejected and the potentially successful bidder's guarantee will be returned unless the bidder agrees in writing to a time extension. If a time extension is effected, bidder may substitute any cashier's check for a satisfactory bid bond. Any contract resulting from this Invitation to Bid shall not be assignable without prior written consent of the City. Under no conditions, shall the contract be assigned to an unsuccessful bidder whose bid was rejected as non-responsive and/or non-responsible. A Notice to Proceed will be issued by the City within fifteen (15) days after final contract execution unless both parties agree in writing to a longer period of time. Special attention is called to the applicability of the Birmingham Plan-Construction Industry Program to the project. Under this Program, the utilization of Minority Business Enterprises and Disadvantaged Business Enterprises (MBE/DBE) is encouraged on a voluntary basis. The Construction Industry Authority established a system of floating MBD/DBE goals which may differ from year to year and project to project. Overall, these goals shall not be less than the historical participation of MBD/DBE's in construction projects of the City and its agencies. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |