Similar Projects
RFQ Engineering - Railroad Crossing Safety (Section 130) Program
Term Contract
Conception
$800,000 CJ est. value
Atlanta, GA 30334

RFQ - Statewide General Environmental Services Contract
Term Contract
Conception
Atlanta, GA 30334

Atlanta Law Building Renovation
Renovation
Design
$30,000,000 to $40,000,000 est. value
Atlanta, GA 30334

Rm Clayton Water Reclamation Center Perimeter Berm Improvements, Atlanta, Ga (Fulton County, Ga)
Renovation
Design
$1,000,000 to $5,000,000 est. value
GA

Construction Manager at Risk - Research Tower
New Construction - 120,000 SF
Bidding
$76,500,000 est. value
Atlanta, GA

RFQ - Geotechnical Engineering, Environmental, and Geotechnical Field Operation Services
Term Contract
Bidding
Atlanta, GA 30334

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Residential Solid Waste Collection/Disposal
Term Contract
Sub-Bidding
Fairburn, GA 30213

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Pest Control Products and Services
Term Contract
Post-Bid

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

D/B Southeast MATOC - Phase 2
Results
$1,000,000 to $170,000,000 est. value

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Janitorial Services Atlanta CSC
Term Contract
Sub-Bidding
Atlanta, GA 30303

USCG National Multiple Award Construction Contract (NMACC III)
New Construction, Renovation, Addition
Post-Bid
$1,500,000 est. value

Last Updated 07/28/2022 02:07 PM
Project Title

Citywide Residential Solid Waste Disposal Services

Physical Address View project details and contacts
City, State (County) South Fulton, GA 30349   (Fulton County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Misc. Buildings, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Purchase Type Duration: 4 years Question Acceptance Deadline 07/01/2022 11:59 PM EDT Questions are submitted online Yes Citywide Residential Waste Disposal Services for approximately 40,000 private residents within the City of South Fulton. Participation Requirements - Minority Business Participation - Small Business Participation General Requirements - Insurance Required - Samples Required - Local Service Required - Contractors License Required - Prevailing Wage Required - License Required - Safety Standards Plan Award Requirements - Reserve Rights to Award by Line Item - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Any questions and/or specification that may need clarification should be submitted in writing, according to the attached schedule, and forwarded to the above address. It is the responsibility of the Service Providers to seek clarification as early as possible prior to the opening of proposals.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents