Similar Projects
Deer Creek Plant Improvements - 20600 North Portland Avenue (Ward 8) - City Of Oklahoma City
Renovation
Conception
$1,546,000 est. value
Edmond, OK 73012

Kenwood Hills Water System Improvements- Construction - WL1903 - City of Broken Arrow
Renovation
Conception
$428,000 est. value
Broken Arrow, OK

Water Reclamation Facility Dewatering Centrifuge Replacement - WW0326 - City of Norman
Renovation
Design
$2,500,000 CJ est. value
Norman, OK 73072

Newcastle Wastewater Treatment Plant Improvements
Renovation
Bidding
$34,200,000 CJ est. value
Newcastle, OK 73065

Wewoka Water Treatment Plant Improvements
Renovation, Infrastructure
Bidding
$15,000,000 CJ est. value
Wewoka, OK 74884

2021 CDBG Wastewater Treatment Improvements- Phase I
Renovation
Post-Bid
$500,000 CJ est. value
Grandfield, OK 73546

Wastewater Treatment Plant Improvements South Canadian Wastewater Treatment Plant
Renovation, Infrastructure
Post-Bid
$203,529,800 CJ est. value
Oklahoma City, OK 73170

Lynn Lane Wastewater Treatment Plant Disinfection Improvements
Renovation
Results
Broken Arrow, OK 74012

Lynn Lane WWTP East Clarifier Rehabilitation
Infrastructure
Results
Broken Arrow, OK 74011

Hochatown - Offsite Improvements - WP #1 - Access Roadway & Facility Maintenance Building
New Construction, Infrastructure
Construction
$5,000,000 CJ est. value
Hochatown, OK 74728

Lynn Lane WWTP Filter Press Replacement Procurement
Renovation
Post-Bid
$610,000 CJ est. value
Broken Arrow, OK 74011

C6 Northside Waste Water Treatment Plant Anaerobic Digester 1 and 2 Improvements
Renovation, Infrastructure
Results
$2,391,975 CJ est. value
Tulsa, OK 74117

Adams Creek Basin Study - City of Marianna
Infrastructure
Post-Bid
$1,415,000 CJ est. value
Broken Arrow, OK 74012

Replacement of Sanitary Sewer Interceptors and Miscellaneous Wastewater Projects
Infrastructure
Results
$12,500,000 est. value
Stillwater, OK

Lawton WWTP Improvements Phase 1
New Construction, Renovation, Infrastructure
Post-Bid
$88,000,000 CJ est. value
Lawton, OK 73501

Last Updated 06/08/2023 06:36 AM
Project Title

Water Treatment Plant Roof Replacement

Physical Address View project details and contacts
City, State (County) Stillwater, OK 74074   (Payne County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline: 5/31/2023 05:00 PM (CT)

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents