Similar Projects
104th Avenue - South Platte River To Highway 85 Widening - City of Commerce City
Infrastructure
Conception
$6,916,000 CJ est. value
Commerce City, CO 80603

The Flaming Gorge Project
New Construction, Infrastructure
Design
$1,000,000,000 CJ est. value
Greeley, CO 80631

Broadview Acres Phase 2 and 3
Infrastructure
Bidding
$517,129 CJ est. value
Greeley, CO 80631

Ramp Works - Weld County
Infrastructure
Bidding
$20,000,000 CJ est. value
Greeley, CO 80634

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

37th Street Row Landscaping
Infrastructure
Post-Bid
$300,000 est. value
Evans, CO 80620

UC Site Improvements
Infrastructure
Results
$350,000 est. value
Greeley, CO

Great Western Trail Connection
Infrastructure
Results
$621,829 CJ est. value
Severance, CO 80550

Fossil Creek Ranch - Filing 1 & 2
Construction
Windsor, CO

Immaculata Plaza II (New Build) and I (Renovation)
New Construction, Renovation, Infrastructure
Construction
$1,000,000 CJ est. value
Greeley, CO 80631

Greeley Apartment / HP Site
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Greeley, CO 80634

2022 Bond - Weld RE-4 School District
New Construction, Renovation, Infrastructure
Pending Verification
$271,000,000 CJ est. value
Greeley, CO 80631

2022 Storm Jetting
Infrastructure
Bidding
$400,000 CJ est. value
Evans, CO 80620

Harmony Ridge Neighborhood Park
Infrastructure
Post-Bid
$300,000 CJ est. value
Windsor, CO 80550

Immaculata Plaza
New Construction, Infrastructure
Construction
$6,000,000 CJ est. value
Greeley, CO 80631

Last Updated 10/18/2022 02:07 PM
Project Title

Cutting Edge Steel

Physical Address View project details and contacts
City, State (County) Dacono, CO 80514   (Weld County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 18, 2022, project site plan has been approved by the city of Dacono. General Contractor is selected but not listed by owner request. Construction is scheduled for Spring 2023.

Details

9,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents