Similar Projects
Channel 2E Improvements at 101st Terrace
Infrastructure
Bidding
$1,400,000 est. value
Pinellas Park, FL 33782

Lake Management Services
Infrastructure
Bidding
Saint Petersburg, FL

Honeymoon Island State Park - Beach Nourishment
Post-Bid
$1,700,000 est. value
Dunedin, FL 34698

5440--Install Shoring for Repair Boiler Plant Column and Wall
Post-Bid
Bay Pines, FL 33744

Seawall Maintenance, Repair and Related Services
Results
Less than $900,000 est. value
Saint Petersburg, FL 33731

Drainage Improvements for Seventh, and Eighth Street - BMP 5
Results
$240,605 to $298,766 est. value
Belleair Beach, FL 33786

Cedarwood and Lyndhurst CMP Replacement and Ditch Stabilization
Infrastructure
Bidding
$589,774 est. value
Dunedin, FL

Undergrounding Utilities Along Gulf Boulevard - Phase II
Post-Bid
Indian Rocks Beach, FL 34635

Jail Perimeter Road Modification into Ditch Behind F-Wing
Results
Less than $1,165,522 est. value
Clearwater, FL 33762

North Highland Avenue Road and Drainage Improvement Phase I
Infrastructure
Bidding
$2,131,000 est. value
Clearwater, FL 33755

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Creek Shoreline Restoration
Results
Less than $600,000 est. value
Saint Petersburg, FL 33711

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Crystal Beach Paving and Drainage Improvements (Pid 002932A)
Results
Less than $1,569,134 est. value
Clearwater, FL

2021 Seawall and Stormwater Imrpovements - Don Cesar Place Neighborhood
Infrastructure
Post-Bid
Saint Pete Beach, FL 33706

Last Updated 01/06/2022 02:37 PM
Project Title

PPWMD Channel 1 Panel Replacement West of 66th Street North

Physical Address View project details and contacts
City, State (County) Pinellas Park, FL 33780   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing, delivering, and installing all materials, equipment, incidentals and services, including labor, for the Work which generally includes, but is not necessarily limited to: Mobilization/Demobilization; soil erosion, sedimentation and dust control measures; continuous noise monitoring during active construction, trim trees within work area; clearing and grubbing; removal and reinstallation of 6-foot high PVC perimeter fence panels at selected locations; removal and replacement of chain link fence; dewatering and by-pass pumping; construct sheet pile vertical wall with The Work to be performed under these Contract Documents includes furnishing, delivering, and installing all materials, equipment, incidentals and services, including labor, for the Work which generally includes, but is not necessarily limited to: Mobilization/Demobilization; soil erosion, sedimentation and dust control measures; continuous noise monitoring during active construction, trim trees within work area; clearing and grubbing; removal and reinstallation of 6-foot high PVC perimeter fence panels at selected locations; removal and replacement of chain link fence; dewatering and by-pass pumping; construct sheet pile vertical wall with concrete cap within the project area, transitioning to the existing earthen channel bank directly west of the project at approximate STA 10+19, transitioning to the existing concrete channel lining directly east of the project at approximate STA 20+03; demolition and remove existing reinforced concrete channel lining within the project area; install underdrain weep hole system as required by the proposed design; excavate material from face of sheet piling to edge of existing concrete channel bottom slab on the southern side of the channel within the project area; remove and repair deteriorated sections of the existing concrete channel bottom within project area, as required; construct new concrete channel bottom from existing concrete channel bottom to sheet pile wall; remove and replace existing 18 inch and 66 inch diameter RCPs as required by the proposed design; remove and construct concrete flumes; re-grade and sod the southern channel top of bank from the western to the eastern project extents; perform general site work associated with the improvements listed above; and all related work for a complete and operable system. All Work shall be done as described in the Contract Documents and as shown on the Drawings complete and ready for operation in 365 calendar days.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents