Similar Projects
Valley Hi Nursing Home Asphalt Parking Lot Crack Filling, Sealcoating, Asphalt Patching, and Traffic Marking/Line Striping
Infrastructure
Bidding
Woodstock, IL 60098

Mchenry County Government Center Asphalt Parking Lot Crack Filling, Sealcoating, and Traffic Marking/Line Striping
Infrastructure
Bidding
Woodstock, IL 60098

Central Division - Asphalt Paving Maintenance
Post-Bid

2021 HMA Materials Only
Post-Bid
McHenry, IL

Union Pacific/Cary Maintenance Garage Site Preparation Improvements
Renovation
Results
Cary, IL 60013

(2.578-Mile) Improvement on Il-120 (Belvidere Road) From Mchenry Co. Line to East of II-60 Consist of Sealing Cracks and Joints in the Existing Concrete Pavement, Restriping Pavement Marking
Results

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

(5.91-Mile) Smart Overlay Along US 14 From Hughes/Hartland Rd to Il 47 including the Installation of 2 Dry Wells at the Intersection of Hughes/ Hartland Road and US 14
Infrastructure
Bidding
Woodstock, IL

2021 Asphalt Purchase
Post-Bid
IL

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

Grind and Overlay of Roadways Including C and G/Sidewalk Spot Repairs
Infrastructure
Bidding
Huntley, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

2021 Road Resurfacing Program
Results
Cary, IL

2022 Road Program
Infrastructure
Bidding
Harvard, IL

Hebron Road Pavement Improvements
Infrastructure
Post-Bid
Hebron, IL

Last Updated 02/09/2022 12:50 PM
Project Title

2022 Resurfacing Program

Physical Address View project details and contacts
City, State (County) Crystal Lake, IL   (McHenry County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rem & Disp Uns Matl 1,716 Cy; Geotech Fab f/Gr Stab 5,150 Sy; Agg Subgrade Improve 1,715 Cy; Preparation Of Bse Sp 51,472 Sy; Bit Matl Tack Ct 2,660 Gal; Agg Base Repair Spl 1,544 Ton; Lev Bind Mm n50 1,150 Ton; Hma Bc Il-19.0 n50 7,422 Ton; Hma Sc "d" n50 5,830 Ton; Hma Sc "d" n70 930 Ton; Hma Surf Rem 2 26,660 Sy; Hma Surf Rem Var Dp 51,475 Sy; Curb Rem & Replacemt 100 Lf; Cl d Patch t1 6 200 Sy; Cl d Patch t4 6 200 Sy; Fr & Lids Adjust Spl 74 Ea Drain Util Str Recon 3 Ea; Traf Cont & Prot 701501 1 Ls; Traf Cont & Prot 701502 1 Ls; Traf Cont & Prot 701602 1 Ls; Traf Cont & Prot 701701 1 Ls; Rr Prot Liability Ins 1 Ls; Railroad Flagger 1 Ls; Temp Pvt Mk Line 4 14,000 Lf;Thpl Pvt Mk Ltr & Sym 586 Sf; Thpl Pvt Mk Line 4 25,550 Lf; Thpl Pvt Mk Line 6 1,176 Lf; Thpl Pvt Mk Line 12 2,545 Lf; Thpl Pvt Mk Line 24 431 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents