Similar Projects
Hospitality Health ER - Micro Lab
Renovation - 547 SF
Design
$150,000 est. value
Longview, TX 75605

Residences At Toler
New Construction
Design
$10,000,000 est. value
Longview, TX 75605

Bicycle and Pedestrian Improvements
Infrastructure
Bidding
$435,667 est. value

Bicycle and Pedestrian Improvements
Infrastructure
Bidding
$653,255 CJ est. value
Tyler, TX 75701

Traffic Signal Installation at South Eastman Road and East Birdsong Street
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Longview, TX 75602

Various - Landscape Development
Infrastructure
Sub-Bidding
$210,290 CJ est. value
Longview, TX 75604

Smallwoods Manufacturing Facility
Renovation - 205,920 SF
Post-Bid
Longview, TX 75601

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Joe Burl Lane Pavement Rehabilitation
Results
Lakeport, TX 75603

Loop 281 and Nealy Way Intersection Improvements
Results
$403,930 est. value
Longview, TX

Work Smart Office Building
New Construction - 15,400 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Longview, TX 75605

Longview Economic Development Offices
New Construction - 8,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Longview, TX 75601

Longview City Center Apartments
New Construction, Renovation, Infrastructure
Design
$350,000 est. value
Longview, TX 75605

US 259 - Resurface Roadway
Infrastructure
Bidding
$4,303,279 CJ est. value
Longview, TX 75605

Parking Lot Expansion
Infrastructure
Post-Bid
Longview, TX 75605

Last Updated 08/01/2022 04:33 PM
Project Title

Kilgore Event Center Renovation

Physical Address View project details and contacts
City, State (County) Kilgore, TX 75662   (Gregg County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 1, 2022, applications have been filed with the Texas Department of Licensing and Regulation. No building permits have been submitted into the City of Kilgore. Information regarding the architect and general contractor has not been disclosed. Construction is not anticipated to start before Q1 2023 * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

10,188 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents