Similar Projects
Brownsville Transit Village - Phase V
New Construction - 99,854 SF
Conception
$26,711,893 est. value
Miami, FL 33142

Varadero
New Construction - 2,456,798 SF
Conception
$10,000,000 CJ est. value
Sunny Isles, FL

The Towers
New Construction
Design
$10,000,000 CJ est. value
Miami, FL 33131

One Brickell City Centre
New Construction - 743,768 SF
Design
$1,000,000,000 est. value
Miami, FL

Prequalification for the NMCRA Residential Rehabilitation Construction Program
Renovation
Bidding
North Miami, FL

Aventura Crossings
New Construction - 599,282 SF
Post-Bid
$10,000,000 CJ est. value
Miami, FL 33180

Qaudro Mixed-Used Building
New Construction - 7,559 SF
Post-Bid
Miami, FL 33127

Phcd Vacant Unit Prep - Contract 2 -South Sector
Results
Less than $3,000,000 est. value
FL

Work Order Contract 2020-South Area
Results
Less than $2,300,000 est. value
FL

Estates at Acqualina
New Construction - 2,178,600 SF
Construction
$558,000,000 est. value
Sunny Isles Beach, FL 33160

Eighty Seven Park
New Construction
Construction
$85,000,000 est. value
Miami Beach, FL

Brickell World Plaza - Phase 2b & 2c
New Construction
Conception
$10,000,000 CJ est. value
Miami, FL

Solid Oaks
New Construction - 54,300 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Miami, FL

PHCD Vacant Unit Preparations
Post-Bid
$1,800,000 est. value
FL

Work Order Contract 2020- North Area
Results
Less than $4,000,000 est. value
FL

Reported 01/07/2020 12:35 PM
Project Title

Madeleine Village Building Renovations and Site Improvements

Physical Address View project details and contacts
City, State (County) Miami Beach, FL 33139   (Miami-Dade County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value $617,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Madeleine Village Apartments, located at 7861-7871 Crespi Boulevard, consists of 4 buildings containing 16 residential, studio units. The buildings are single story structures with an elevation of approximately 14 ft. and 6,928 GSF. This property is classified as a “Contributing property”, to the North Shore Historic District. It is in the Post War Modern style. The property was designed by Lester Avery and built by A. Altman Builders in 1952. The structural system is cbs iii. The foundation is spread footing. Exterior walls are stone veneer and stucco. The rehab will expose the blue stone veneer on all facades and planter boxes that have been painted over. The building has a flat roof.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents