Similar Projects
Runway 17-35 Asphalt Mill, Replace, Re-marking, and Signage Corrections to Runway 18-36
Bidding
$345,000 est. value
Valdosta, GA 31601

Taxiway Markings
Post-Bid
Columbus, GA 31909

Taxiway Mill and Overlay for Moultrie Municipal Airport
Post-Bid
Moultrie, GA 31768

Remark Runway 9/27, T-Hangar Pavement, Obstruction Removal
Results
Less than $182,325 est. value
Toccoa, GA

Runway 11- 29 Seal Coat, Crack Seal, and Remarking Project
Results
$150,000 to $225,000 est. value
Wrens, GA 30818

Runway 10-28 and 1-19 Rubber Removal
Construction
Savannah, GA

Airport Runway Pavement Rehabilitation
Post-Bid
Hawkinsville, GA 31036

Wcrunway1-19/31 - Runway 1-19 Signage and REIL Improvements
Results
Waycross, GA 31501

Apron Expansion
Post-Bid
Warner Robins, GA 31088

Ramp 19 and Taxilane A3 Pavement Replacement
Results
Atlanta, GA 30303

Runway Taxiways, and West Apron Rehabilitation
Post-Bid
Thomaston, GA 30286

Runway 2 Safety Area Improvements
Results
Less than $1,246,199 est. value
Rome, GA 30165

Runway Pavement Rehabilitation
Post-Bid
Cartersville, GA

Airport Primary Surface Improvements Phase 1
Results
GA

Airfield Pavement Rehabilitation
Post-Bid
Hazlehurst, GA

Reported 04/28/2021 12:00 AM
Project Title

Runway 16-34 and Taxiway Improvements

Physical Address View project details and contacts
City, State (County) Tifton, GA 31793   (Tift County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer - 03/24/21
Owner View project details and contacts
Architect View project details and contacts
Description

Deteriorating pavement section for Runway 16-34, Runway 16 blast pad, parallel Taxiway A, and several connecting taxiways by utilizing an asphalt overlay rehabilitation. Additionally, a new full depth asphalt section for the Runway 34 blast pad. The project will also include pavement demolition of several connecting taxiways as well as runway shoulders. Finally, updated taxiway geometry by widening the fillets at all the connecting taxiways that are not demolished. Related work will include grading, drainage, and taxiway safety area improvements. Runway and Taxiway edge lighting and signage will be incorporated along with additional miscellaneous items such as erosion control, grassing and pavement marking.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents