Similar Projects
Road Work - Azalea Drive Sidewalk Project TST
Infrastructure
Bidding
North Charleston, SC 29405

Road Work - E. Ashley Avenue, Folly Beach Drainage Improvements, Waterline Replacement and Sidewalk Replacement CTC
Infrastructure
Bidding
Charleston, SC

CDBG Sidewalk Improvements
Post-Bid
North Charleston, SC 29419

Pedestrian Path - West 2nd Street
Post-Bid
Folly Beach, SC

Zucker GEC Parking Lot - Resurface
Results
$103,318 est. value
North Charleston, SC 29634

St. Julian Devine Community Center Site Improvements
Results
Less than $399,557 est. value
Charleston, SC 29403

Accessibility Improvements Part 1 Parking and Park Center Access, Isle of Palms County Park
Infrastructure
Bidding
Isle of Palms, SC 29451

CARTA Parking Lot Expansion
Infrastructure
Post-Bid
North Charleston, SC 29405

Oakbrook Middle School Bus Parking Lot
Results
$150,000 to $250,000 est. value
Ladson, SC 29456

Road Work - Resurfacing Ten (10) County Owned Parking Lots
Infrastructure
Bidding
SC

Kelly House Exterior Walkway Structural Repairs
Results
$685,000 to $835,000 est. value
Charleston, SC 29424

Beach Access Walkover Replacement
Results
Less than $34,160 est. value
Folly Beach, SC 29439

Building 401 Parking Lot Repaving
Results
Charleston, SC 29413

Dills Bluff Road Sidewalk
Results
Charleston, SC 29412

Stuart Engals Boulevard Sidewalk
Results
Mount Pleasant, SC 29464

Reported 09/16/2021 09:33 AM
Project Title

Community Center Parking Area Replacement

Physical Address View project details and contacts
City, State (County) Folly Beach, SC 29439   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace approximately 30’deep by 100’ long parking lot servicing the Folly Beach Community Center and Library. Replacement material is to be previous concrete.See site plan and screen shots attached. Contract to include all demolition, removal, disposal of existing asphalt, sub-base and new previous concrete parking pad, and any striping and ramp required for 2ea ADA compliant parking spaces (match existing)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents