Similar Projects
Liberty Park Pipe Lining, Crown Point
Infrastructure
Design
$5,000,000 est. value
Crown Point, IN

Independence Hill Conservancy District Sanitary Sewer Lateral Pipelining, Merrillville
Infrastructure
Design
$5,000,000 est. value
Merrillville, IN

Airport Water Main Installation - 2022
Infrastructure
Bidding
$200,000 est. value
West Lafayette, IN

Division 4 - Off-Site Utilities for Water Treatment Plant
Infrastructure
Bidding
$5,769,760 est. value
Danville, IN

Water Main Relocation
Post-Bid
Petersburg, IN

Baldwin Street Water Main
Post-Bid
Bargersville, IN 46106

Jefferson Street Water Main Improvements
Results
Huntington, IN 46750

River Ridge Elevated Water Storage Tanks
Results
Jeffersonville, IN 47130

Pool and Spray Park Water Maintenance
Term Contract
Post-Bid
Indianapolis, IN

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

Chrisney Water Improvements
Post-Bid
Chrisney, IN

5400 Carroll Road Water Main Extension
Results
Lawrence, IN 46226

Calumet Avenue Water Distribution System Improvements - Contract -3
Post-Bid
Dyer, IN 46311

State Road 10 Water Main Extension
Results
DeMotte, IN

2021 Roadway and Water Main Improvements - Crestwood, Bluebird, Elliott, Timrick
Post-Bid
Munster, IN 46321

Reported 06/24/2022 12:00 AM
Project Title

South Grove Landing Sewer Main Extension

Physical Address View project details and contacts
City, State (County) Bargersville, IN 46131   (Johnson County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project shall include the installation of a new 12" gravity sanitary sewer from the lift station on Fulmer Drive and will LEGALS extend approximately 3,500 feet to the south.The Proposal must be made on the forms provided in the Contract Documents. Each bid shall be accompanied by a cashier's or certified check, drawn on an acceptable bank, or an acceptable bidder's bond, in an amount not less than five percent (5%) of the total amount of the bid, payable to the Town of Bargersville, Indiana.Bids may be held by the Town of Bargersville, Indiana, for a period of not to exceed sixty (60) days from the date of the opening of the bids for the purpose of reviewing the bids and the investigation of the qualifications of bidders, prior to awarding of the Contract.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents