Similar Projects
Construction of Deerwood Elementary School Sidewalk Project and Construction of Bellalago Academy Sidewalk Project
Infrastructure
Bidding
$91,364 est. value
Kissimmee, FL 34759

Hunt Brothers Park and West Lake Wales Park Playground Equipment and Installation
Renovation
Bidding
Lake Wales, FL 33898

Construction Services for Master Project Improvements Phase 3
Post-Bid
FL

Construction Services for Master Project Improvements Phase 4
Post-Bid
FL

Racquetball - Cindy Hummel Tennis Center
Results
Auburndale, FL 33823

Winter Haven Supervisor of Elections Parking Lot Resurface, Restriping
Results
Less than $60,000 est. value
Winter Haven, FL 33880

Construction Services for Project Improvements Phase 3
New Construction, Infrastructure
Bidding
FL

Waverly Park Playground Installation
Post-Bid
Lake Wales, FL

Bike Path/Trail/Lighting/Drainage Improvements
Results
Less than $832,392 est. value
Polk City, FL 33868

Design Build Services for Lake Maude Recreation Park Phase II
New Construction
Bidding
Winter Haven, FL 33881

Lake Pierce Ranchettes Park Playground Installation
Post-Bid
Lake Wales, FL 33898

Ariana Street Sidewalk
Results
Less than $656,854 est. value
Lakeland, FL 33803

ADA Mat Replacement
Infrastructure
Bidding
$85,000 est. value
FL

ADA Ramp Construction
Post-Bid
Lakeland, FL 33805

Polk County East Government Complex Parking Lots
Results
Less than $85,000 est. value
Bartow, FL 33830

Last Updated 12/28/2021 12:24 PM
Project Title

Mary Holland Park Soccer Fields and Parking

Physical Address View project details and contacts
City, State (County) Bartow, FL   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor will protect the existing utilities on the site while excavating the poor soils and replacing them with drainage fill, removing existing fences, sidewalks and other associated demolition. This project shall also include construction of associated drainage, underdrains, sodding, fencing, sidewalks and paving to construct the proposed soccer fields and grassed parking. All excess fill, construction and demolition debris shall be disposed of by the Contractor.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents