Similar Projects
Banner Gilbert Medical Center Parking Lots
Design
Gilbert, AZ 85234

Buckeye Pool & Parking Expansion
New Construction - 19,000 SF
Design
$1,450,000 est. value
Buckeye, AZ 85326

Pavement Preservation
Infrastructure
Bidding
$1,773,000 est. value
AZ

Construction Manager at Risk - Roadway Improvements Avondale and Lower Buckey
Infrastructure
Bidding
$300,000 est. value
Avondale, AZ 85353

Research on the Impact of Diamond Grind Pavement Resurfacing on PM-10 Emissions
Term Contract
Post-Bid
AZ

2020-2021 General Construction Services
Post-Bid
Phoenix, AZ

Pinnacle Peak Road 45th Avenue to 35th Avenue Paving and Storm Drain Improvements
Results
$9,000,722 est. value
Glendale, AZ 85310

Phoenix-Casa Grande Highway (I-10) 1-17 (Split) to SR 202L (Santan)
Results
Chandler, AZ 85225

Jackrabbit Crossing - West Indian School Road Eastbound Half Street Improvements, West Of North Jackrabbit Trail
Infrastructure
Construction
$1,275,000 est. value
Phoenix, AZ 85042

Bowie Jct - Safford Highway (US191) (I-10 Ti - Ten Ranch Road)
Infrastructure
Bidding
$3,000,000 est. value
Surprise, AZ 85387

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

2020 District-Wide Paving Maintenance
Results
$1,669,834 est. value
Tempe, AZ

Eastmark Phase XX Roadway, Traffic Signal and Waterline Improvements (DU1)
Infrastructure
Bidding
$6,900,000 to $8,000,000 est. value
Mesa, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

North Lake Road and Rattlesnake Cove Road Maintenance and Restoration
Results
Cave Creek, AZ

Last Updated 05/10/2022 03:07 PM
Project Title

System Preservation (Restoration/Rehab/Resurface)

Physical Address View project details and contacts
City, State (County) Buckeye, AZ   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,718,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project is located on Interstate 10 in Maricopa County, in the Southwest District, within the City of Buckeye. The project limits begin at milepost 105.95 and end at milepost 112.33. The work consists of milling the existing pavement surface and replacing it with new asphalt concrete, project also includes guardrail installation , drainage work, bridge deck rehabilitation work, pavement marking, traffic control and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents