Similar Projects
Marion Stadium
New Construction
Results
Marion, IA 52302

Softball Stadium Improvements
Renovation
Results
Pleasant Hill, IA

Stadium Ticket Booth and Fencing
New Construction, Alteration
Results
Creston, IA 50801

Pella High School Athletics Stadium Additions
Addition
Conception
Pella, IA 50219

DMPS Community Stadium At Drake University
New Construction
Post-Bid
Des Moines, IA 50311

Mystique Community Ice Center Rink Ice System Removal and Replacement Project
Renovation
Post-Bid
Dubuque, IA 52001

Suite Shots
New Construction, Term Contract - 50,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
West Des Moines, IA

Sports Performance Center and Jack Trice Stadium Improvements North-Bergstrom Football ComplexRooms 2050, 2054, and 2056 Remodel
Renovation
Results
$570,000 est. value
Ames, IA 50011

Ice Center
Renovation
Pending Verification
$1,200,000 to $1,400,000 est. value
Sioux City, IA 51106

Pro Iowa Soccer Stadium & Global Plaza
New Construction
Pending Verification
Des Moines, IA 50309

Des Moines Buccaneers Hockey Arena
Renovation
Design
Des Moines, IA 50310

Collins-Maxwell CSD Stadium
New Construction
Post-Bid
Maxwell, IA

Mystique Ice Rink Concrete Subfloor Project
Renovation, Alteration
Post-Bid
$60,000 est. value
Dubuque, IA 52001

Reported 05/11/2022 12:00 AM
Project Title

Mystique Community Ice Center Settling Remediation Project

Physical Address View project details and contacts
City, State (County) Dubuque, IA 52001   (Dubuque County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $460,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project will provide for completing non-destructive subsurface soil stabilization and settlement remediation repairs within the confined finished space of the Mystique Community Ice Center. Remediation solutions to provide both long-term settlement control and improve support to the existing slab-on-grade floor conditions may include the installation of geopiers, micropiles, helical piles, deep compaction grout applications, deep injection polymers, polyurethane foam grouting and slab-jacking.

Details

Stadium, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents