Similar Projects
DMC Green Roof Structural Reinforcement
Demolition, Alteration
Post-Bid
Milwaukee, WI 53203

MEPF Design Assist for East, West and Capital High Schools
Alteration
Post-Bid
Madison, WI 53704

HVAC Upgrades Fire Station 2 and Fire Station 3
Results
Appleton, WI 54915

HVAC Upgrades Fire Station 2 and Fire Station 3
Results
Appleton, WI 54915

Replace an Existing Furnace
Alteration
Post-Bid
Sayner, WI

Jail Cooling Tower Replacement
Results
Portage, WI 53901

Remodeling of the Forest County Courthouse
Alteration
Post-Bid
Crandon, WI 54520

Administration Building Heat Pump Replacement Phase 3
Results
Kenosha, WI 53140

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Boiler and Cooling Tower Pumps Replacement
Results
Oshkosh, WI

2021 HVAC Duct Cleaning
Term Contract
Post-Bid
Big Bend, Eagle, Mukwonago, North Prairie, WI 53103

Replacing the HVAC Pneumatic Compressor
Results
Darlington, WI 53530

NWHC Replacement of Air Handling Unit - FS-06
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Madison, WI

Building B Air Tempering - Phase 1 - MEP
Results
Less than $2,200,000 est. value
Oshkosh, WI

Air Handling Upgrades
Alteration
Post-Bid
New Richmond, WI

Last Updated 12/05/2022 05:09 PM
Project Title

AHU Replacement Hilltop Center University of Wisconsin-Eau Claire

Physical Address View project details and contacts
City, State (County) Eau Claire, WI 54701   (Eau Claire County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $254,479 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of air handling unit serving west section of 2 nd floor. Ductwork and piping will be replaced in mechanical room. AHU DDC controls will be upgraded The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. In general, the work consists of: Replacement of air handling unit serving 2nd floor west area of Hilltop dining area. Ductwork and piping will be replaced in mechanical room. AHU DDC controls will be upgraded

Details

1 Story Above Grade, Renovation, Renovation.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents