Similar Projects
Hudson Place Mixed Use
New Construction - 25,000 SF
Design
Newburgh, NY 12550

Water Treatment Plant
Design
Less than $7,400,000 est. value
Rouses Point, NY 12979

Job Order Contract For South General Construction
Term Contract
Bidding
$17,850,000 to $24,150,000 est. value
Brooklyn, New York, Staten Island, NY 10065

Job Order Contract For South General Construction
Term Contract
Bidding
$17,850,000 to $24,150,000 est. value
Brooklyn, New York, Staten Island, NY 10065

Water Treatment Plant Controller Upgrades
Post-Bid
Tuxedo Park, NY 10987

Purchase Filter Media
Post-Bid
Mechanicville, NY 12118

Water Plant Fluoride Room Addition
Addition
Results
Less than $320,000 est. value
Williamson, NY 14589

Upgrades to the Water Treatment Plant's Junction Chamber and Pretreatment Buildings (AS)
Results
Yonkers, NY 10703

Wastewater Treatment Plant Nutrient Removal and Disinfection Improvements
Construction
Less than $3,000,000 est. value
Painted Post, NY 14870

Corfu Wastewater Treatment Facility Expansion
Construction
Less than $4,350,000 est. value
Corfu, NY 14036

Water Dynamic Corp Storage Building
New Construction, Renovation - 2,291 SF
Pending Verification
Less than $500,000 CJ est. value
Southold, NY 11971

Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Tivoli Wellhouse and Wellfield Improvements
Post-Bid
Tivoli, NY 12583

Wastewater Treatment Plant Flood Mitigation
Results
Endicott, NY 13760

Water Treatment Facility Upgrade
Construction
Millbrook, NY 12545

Last Updated 02/02/2022 03:04 PM
Project Title

Wastewater Treatment Plant - Phase I Improvements

Physical Address View project details and contacts
City, State (County) Vernon, NY 13476   (Oneida County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method
Project Status Construction Commenced September 2021, Construction Completion Expected third quarter 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $3,800,000 to $4,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 1 – General Contract No. 2 – Electrical Contract No. 3 – HVAC Contract No. 4 – Plumbing Conversion of the existing 30,000-gallon influent equalization tank into a new headworks facility to include a new influent channel equipped with a mechanical fine screen and associated appurtenances enclosed by a new precast concrete building mounted over the channel, and an aerated grit chamber equipped with a coarse bubble diffused air system. • Rehabilitation of an existing one-room masonry building to be used to house: controls for the above referenced headworks facility, the blower for the above-referenced grit chamber diffused air system, and controls for the equalization system described below. • Construction of a new influent equalization system consisting of: a precast 80,000-gallon equalization tank and cast-in-place slab, meter vault, duplex submersible pumping station and wet well manhole, and associated appurtenances and piping. • Construction of a new mechanical fine screen and associated appurtenances to be retrofitted into the existing influent channel located in headworks area inside the Control Building. • Construction of a new distribution box to combine flows received from the two headworks facilities referenced above and split the combined flow to feed the secondary aeration tanks. • Conversion of the two existing contact stabilization tanks and integral clarifiers into fullfloor secondary aeration tanks and anoxic zones and related secondary aeration system improvements to include, for each tank: - Demolition of the complete center clarifier mechanism and all related piping, weirs, baffles and appurtenances, the complete coarse bubble diffuser system in the annular tank surrounding the clarifier chamber and all associated air piping, associated railings and miscellaneous appurtenances; ii - Modifications and improvements to the structural steel bridge/walkway assembly, the steel cylinder that forms the center chamber wall, and the steel baffle walls that extend radially through the annular zone, all to be reused; - Construction of a 12-inch vertical extension to the top of the concrete tank wall with cast-in-place concrete; - Construction of a new full-floor fine bubble diffuser system in the annular zone, air header piping and valves; - Construction of a new submersible mixers in the anoxic zone and associated lifting systems (jib cranes) mounted on the bridge/walkway above; - Construction of new process piping, valves, and supports inside the tank, to include core drilling new pipe penetrations through the tank wall for the influent and return sludge pipes, new pipe supports and hangers, and sealing and patching of unused existing openings. • Construction of a new overhead air piping system extending from the blower room in the Control Building to each tank and corresponding modifications to the air piping inside the blower room and to the Control Building structure for air pipe penetrations. • Upgrade of the existing return sludge pumping system to include: demolition and replacement of the existing submersible pumps, breakaway fittings, discharge elbows and piping, guiderails and associated appurtenances located in the return sludge wet well with new submersible chopper pumps and corresponding accessories; demolition and replacement of the existing piping, valves and flow meters in the valve vault next to the return sludge wet well; and repairs to the concrete vault to seal around the pipe penetrations into the vault and eliminate groundwater infiltration. • Construction of a new plant water system (wet well manhole, duplex submersible pumping system and controls) and associated piping to be located near and connected to the chlorine contact tanks; • Construction of new positive displacement blowers and associated piping, valves and appurtenances for supplying compressed air to the aerobic digesters, to be housed inside a new precast building to be constructed on grade near the digesters. • Demolition and replacement of existing digested waste sludge pumps, piping and appurtenances located in the basement of the Control Building with a new reciprocating positive displacement sludge pump, piping and appurtenances. • Modifications to the existing pole barn structure and construction of new facilities to be located inside the existing pole barn to accommodate the Owner’s mobile/trailermounted sludge dewatering equipment. • Replacement of existing and construction of new underground process piping. • Site/civil construction and modifications. • Corresponding structural work for new facilities and modification to existing facilities. • Construction of electrical upgrades to include a new outdoor emergency generator and weather tight sound attenuating enclosure, switchgear, electrical distribution systems and miscellaneous electrical upgrades. iii • Construction of new HVAC systems in new buildings and upgrades to existing heating and ventilating systems. • Upgrades to existing plumbing systems including replacement of the existing 2-inch potable water service and backflow prevention device for non-potable water supply with a new 4- inch potable water service, backflow prevention device, and connections to existing the non-potable water system in the Control Building and new non-potable piping and yard hydrants.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents