Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Bidding
Fresno, Sequoia National Park, CA

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Bidding
Fresno, Sequoia National Park, CA

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

Imola Ave and SR-29 Express Bus Improvements Project
Infrastructure
Post-Bid
$2,600,000 est. value
Napa, CA 94559

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

Province at San Gabriel Condominiums
New Construction, Build-Out, Infrastructure - 195,000 SF
Construction
$20,000,000 est. value
San Gabriel, CA 91776

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

General Engineering (A License) Construction, San Joaquin, Stanislaus, and Tuolumne Counties, Hetch Hetchy
Infrastructure, Alteration
Bidding
$5,000,000 est. value
San Joaquin, CA 93660

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

County of Placer - 2021 Roadway Surface Treatments
Alteration
Results
CA

Construction Pine Flat Road Repair Project
Infrastructure
Post-Bid
CA

SB1 Road Maintenance Projects at Various Locations, FY 2020-2021
Infrastructure
Results
Hollister, CA

Last Updated 01/19/2022 04:01 AM
Project Title

Cold plane AC pavement, HMA (Type A), Slurry Seal, and Striping

Physical Address View project details and contacts
City, State (County) CA   (Tulare County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $780,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 070030 Lead Compliance Plan Ls Lump Sum 2 090100 Time-Related Overhead (Wday) Wday 35 3 120090 Construction Area Signs Ls Lump Sum 4 120100 Traffic Control System Ls Lump Sum 5 120103 Stationary Impact Attenuator Vehicle Day 4 6 128652 Portable Changeable Message Sign (Ls) Ls Lump Sum 7 129161 Automated Flagger Assistance Device Day Ea 70 8 130100 Job Site Management Ls Lump Sum 9 130200 Prepare Water Pollution Control Program Ls Lump Sum 10 130620 Temporary Drainage Inlet Protection Ea 21 11 141101 Remove Yellow Painted Traffic Stripe (Hazardous Waste) Lf 37,100 12 141103 Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste) Lf 22,300 13 141104 Remove Yellow Thermoplastic Pavement Marking (Hazardous Waste) Sqft 1,380 14 377501 Slurry Seal Ton 920 15 390132 Hot Mix Asphalt (Type a) Ton 1,800 16 397005 Tack Coat Ton 6 17 398200 Cold Plane Asphalt Concrete Pavement Sqyd 10,800 18 810120 Remove Pavement Marker Ea 2,510 19 810230 Pavement Marker (Retroreflective) Ea 2,510 20 820750 Furnish Single Sheet Aluminum Sign (0.063"-Unframed) Sqft 1,080 21 820900 Install Roadside Sign Panel On Existing Post Ea 190 22 840516 Thermoplastic Pavement Marking (Enhanced Wet Night Visibility) Sqft 4,290 23 840583 6" Two-Component Paint Traffic Stripe Lf 76,600 24 840614 6" Two-Component Paint Traffic Stripe (Broken 12-3) Lf 710 25 840616 6" Two-Component Paint Traffic Stripe (Broken 36-12) Lf 2,660 26 840619 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 12-3) Lf 330 27 846007 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) Lf 41,100 28 846008 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 8-4) Lf 650 29 846020 Remove Painted Traffic Stripe Lf 40,300 30 846030 Remove Thermoplastic Traffic Stripe Lf 19,100 31 846035 Remove Thermoplastic Pavement Marking Sqft 2,180 32 872135 Modifying Traffic Monitoring Stations Ls Lump Sum

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents