Similar Projects
Strategic Planning and Operational Flexibility (SPOF) Support
Term Contract
Design
Saint Marys, GA - Bangor, WA 31558

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Bidding
Less than $98,000,000 est. value

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

On-Call Geotechnical Engineering Consulting Services
Term Contract, Infrastructure
Post-Bid
$150,000 est. value
WA

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Winslow Water Tank Replacement
Infrastructure
Bidding
Bainbridge Island, WA

Engineering Consultant Services for On-Call Geotechnical Services
Term Contract
Post-Bid
WA

Regional A-E Environmental Services
Renovation, Term Contract
Bidding

6th Street Pavement Preservation Phase III
Term Contract, Infrastructure
Post-Bid
Bremerton, WA 98337

Winslow Water Tank Replacement Project
Term Contract, Alteration
Bidding
Bainbridge Island, WA

Electrical Engineering Services
Infrastructure
Post-Bid

Transportation Planning and Civil and Structural Engineering Design
Infrastructure
Bidding
Bremerton, WA 98312

A/E Professional Services for Bethel Phase 1 - Street Improvement Project
Infrastructure
Post-Bid
Port Orchard, WA 98366

Reported 12/04/2021 12:00 AM
Project Title

COBI Storm Water System Plan

Physical Address View project details and contacts
City, State (County) Bainbridge Island, WA   (Kitsap County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Complete storm water asset inventory and GIS mapping. 2. Storm water System Plan approach / scope development support including but not limited to: a. Summarize status of recommended actions contained in the City of Bainbridge Island Surface Water Management Plan 2001. b. Complete a gap analysis to identify changes required for compliance with Ecology’s Storm water Management Manual for Western Washington as well as looking ahead to the 2019 version which is anticipated to be adopted before July 2022 and the City of Bainbridge Island. 3. Storm water System Plan preparation support including but not limited to: a. Summarize the interface with NPDES Phase II Permit requirements, Ecology’s SWMMWW, City of Bainbridge Island Climate Action Plan, the City’s forthcoming Groundwater Management Plan, and other applicable City plans, codes and policies. b. Recommend improvements to current storm water monitoring program / asset management program. c. Recommend actions to improve storm water water quality. d. Recommend actions to address climate change impacts including sea level rise and increased storm intensities. e. Develop a Storm water Management Action Plan (SMAP) consistent with the City’s NPDES permit requirements. f. Provide a prioritized project list from the City’s current Capital Facilities Plan. g. Recommend additional projects, as needed including ballpark budget estimates, resource requirements, rationale and general timing, differentiate ‘have to’ vs ‘nice to have’ projects, and general cost benefit considerations. h. Prepare an Implementation Plan and Plan Effectiveness Monitoring Plan. 4. Community engagement support and coordination with City Advisory Committees, which will be led by the City.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents