Similar Projects
Last Updated | 02/14/2022 03:09 AM |
Project Title | W. St. Paul Avenue, Mountain Avenue to Madison Street |
Physical Address | View project details and contacts |
City, State (County) | WI (Waukesha County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sidewalks/Parking Lot, Storm/Sewers, Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Grade, Sanitary Sewer, Water Main, Storm Sewer, Base, Concrete Pavement, Asphalt Pavement, Curb and Gutter, Sidewalk, Signals, Lighting, Signing, and Pavement Marking, Excavation Common, 16,599 CY; Backfill Granular, 2,281 Ton; Base Aggregate Dense, 10,856 Ton; Concrete Pavement, 22,075 SY; Marking Epoxy, 12,975 LF; Construction Staking, 15,817 LF; Construction Staking, 123 Each; Construction Staking, 2 LS; Conduit, 9,803 LF; Sanitary Sewer Pipe, 475 LF 8”, 624 LF 10“, 133 LF 18“, 399 LF 24“, 1,214 LF 42“, 1,182 LF 48”; Storm Sewer Pipe, 885 LF 12“, 619 LF 15“, 494 LF 18“, 6 LF 21“, 247 LF 24“, 31 LF 30”; Storm Sewer / Culvert Pipe Horizontal Elliptical or Pipe Arch, 238 LF 19” X 30”, 496 LF 24” X 38”; Concrete Curb, 138 LF; Concrete Curb and Gutter, 3,662 LF; Concrete Sidewalk, 28,515 SF; HMA Pavement, 488 Ton; Tack Coat, 86 Gals; Signs, 391 SF; Pull Boxes, 52 Each; Concrete Bases, 30 Each; Poles, 27 Each; Lighting Control Cabinet, 1 Each; Communications Vault, 12 Each; Hydrant Assembly, 5 Each; Traffic Controller and Cabinet, 2 Each; Sanitary Sewer Lateral, 648 LF |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |