Similar Projects
The Dairy Residential Subdivision
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Orchard Homes, MT 59804

The Dairy Residential Subdivision
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Orchard Homes, MT 59804

Historical Museum at Fort Missoula Alien Detention Center Barracks
New Construction, Renovation, Infrastructure
Design
$691,100 CJ est. value
Missoula, MT 59804

RFQ Construction Manager - General Contractor/Construction Manager for Animal Shelter Expansion
Addition, LEED Certification, New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Missoula, MT 59808

MRA URD II Montana Idaho Water and Sidewalk Project - Phase 1
Infrastructure
Bidding
$400,000 CJ est. value
Missoula, MT 59802

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Montana Museum of Arts Culture Building Site Work Project
Infrastructure
Post-Bid
Missoula, MT 59812

Hudson Bay Divide South
Infrastructure
Results

Cooper Street Alley Water Main Replacement Project
Infrastructure
Results
Missoula, MT

Grant Creek Village
New Construction, Infrastructure
Construction
$190,000,000 CJ est. value
Missoula, MT 59808

Riverfront Triangle
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Missoula, MT 59802

Science Lab & Forestry Building - University of Montana
New Construction, Infrastructure
Pending Verification
$34,000,000 CJ est. value
Missoula, MT 59812

South Avenue Improvements (Reserve to 36th) - S-19 - City of Missoula
New Construction, Infrastructure
Conception
$4,200,000 CJ est. value
Missoula, MT 59804

Travelers Rest State Park Chip Seal and Re-Stripe
Infrastructure
Post-Bid
Lolo, MT 59847

Overlay and Chip Seal Frontage Rd W of Columbus Billings Area
Infrastructure
Results

Last Updated 12/13/2022 06:37 AM
Project Title

North 5th & 6th Street West Water Main Replacements & Surface Improvements

Physical Address View project details and contacts
City, State (County) Potomac, MT 59823   (Missoula County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of, but is not necessarily limited to: The installation of new water mains to replace existing water mains in North 5th Street West, North 6th Street West, and Kennett Avenue. This project also includes surface improvements with curb, sidewalk, ADA, and drywell sumps along North 5th Street West. More specifically, this includes new 8-inch ductile iron water mains, bored 8" HDPE water main, new fire hydrant assemblies, connections to existing mains, installations of new appurtenances, water service connections and swaps, abandonments of existing water mains, and surface restoration of disturbed areas including asphalt, concrete, gravel, landscaping, and irrigation. Contract Time Frame: 120 calendar days Allowable work dates: Earliest start of Spring 2023 (based on weather) Latest start of June 2, 2023 (so to be complete by date below and have necessary work done as stipulated below) Latest Allowable Substantial Completion Date: September 30, 2023 Work in North 5th Street shall be completed from station 9+00 to at least station 10+00 no later than July 1st , 2023. In addition, work in North 6th Street shall be completed from station 0+00 to 0+75 no later than July 1st , 2023. Contractor will be required to coordinate with the separate City of Missoula project for the Turner/Worden surface improvements project that will be occurring at a similar time and adjacent to this project.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents