Similar Projects
Reported | 04/27/2022 12:00 AM |
Project Title | Design Services for South River Trail VI - Extension from Near Boulder Walk Drive and Intrenchment Creek to Crestdale Circle |
Physical Address | View project details and contacts |
City, State (County) | GA (DeKalb County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Consultant shall provide an approved concept report, preliminary construction plans, signing and marking plans, signal plans, bridge plans, final right-of way plans (including revision), erosion control plans, staging plans, and final construction plans (including revisions through project final acceptance). All required engineering studies are considered part of the scope of services. All deliverable shall be in accordance with but not limited to the Plan Development Process (PDP), Electronic Data Guidelines, Plan Presentation Guide , NEPA and the GDOT Environmental Procedure Manual, GDOT Design Policy Manual, GDOT Drainage Manual, and the GDOT Bridge and Structures Design Manual,. A draft phased concept report exists under PI 0015065 |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |