Similar Projects
Residential Home Repair - composition Roof Replacement
Renovation
Sub-Bidding
$50,000 CJ est. value
Tacoma, WA 98405

Office Flat Roof Replacement at Cove East Apartments
Renovation - 2,695 SF
Sub-Bidding
$35,594 CJ est. value
Federal Way, WA 98003

Port of Bellingham Re-Roof International Trades Building
Alteration
Post-Bid
$360,000 est. value
Bellingham, WA

Dirtworks Gazebo Roof Replacement project
Alteration
Post-Bid
Olympia, WA

Roofing Services
Term Contract
Results
$272,484 est. value
Seattle, WA

Fleet Services Roof Replacement
Alteration
Results
Seattle, WA

Health and Human Services (HHS) Roof Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Longview, WA 98632

Roof Replacement at Glenhaven Condominiums
Alteration
Post-Bid
Langley, WA 98260

Wallenstien Performing Arts Roof Replacement
Alteration
Results
$375,000 to $480,000 est. value
Moses Lake, WA 98837

Washington State Penitentiary - East Complex Roof and Cooler Repairs
Renovation
Sub-Bidding
$782,853 CJ est. value
Walla Walla, WA 99362

Arlington Library Roof Replacement
Alteration
Post-Bid
Arlington, WA 98223

Weatherization Residential Insulation 8560
Alteration
Results
WA

FY2022-23 Evergreen High School Covered Walkway Roof Replacement
Renovation
Sub-Bidding
$215,000 CJ est. value
Vancouver, WA 98684

Weatherization - URGENT Roof
Alteration
Post-Bid
WA

Weatherization Residential Insulation 8554
Alteration
Results
WA

Last Updated 02/25/2023 06:03 AM
Project Title

Harmony Elementary School Roof Replacement

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98684   (Clark County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,205,200 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated Construction costs - $1,140,000.00. The Contractor will provide all labor, equipment, materials, project management, and site supervision as required to complete the Harmony Elementary School Roof Replacement scope of work described in the project drawings and specifications. Each bid must be accompanied by bid security in the form of a bid bond for not less than five percent (5%) of the base bid amount, excluding applicable State of Washington taxes. Bid security shall be forfeited as damages should the Bidder neglect or refuse to enter into a contract and provide a suitable bond for performance/payment for labor and materials. The project is estimated to cost $1,140,000.00. The Board of Directors of Evergreen Public Schools reserves the right to reject any or all bids or portions thereof and waive any informality or irregularities.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents