Similar Projects
Last Updated | 10/04/2022 11:13 AM |
Project Title | Restroom Renovations at Pierre Part Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Pierre Part, LA 70339 (Assumption County) |
Category(s) | Education |
Sub-Category(s) | Elementary School |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $414,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Sealed bids will be received by the Assumption Parish School Board for the Restroom Renovations at Pierre Part Elementary School, 3321 Hwy. 70, Pierre Part, Louisiana, Architect's Project No. 2207B. All bids shall be submitted in a sealed envelope bearing legibly on the exterior, the following: 1. Owner's Name and Address 2. Project Name 3. Contractor's name, address, and license number Bids can be submitted electronically at website. Bid prices shall specifically EXCLUDE any and all taxes whatsoever. Louisiana Revised Statues La. R.S. 47:301(8)(c) exempts local governments from state and local tax effective September 1, 1991. Bid prices shall include any shipping charges, if applicable. Each bid shall be accompanied by a bid security of NOT less than five (5%) percent of the total bid amount. Said amount shall be in the form of a Bid Bond, Certified Check, or Cashier's check drawn on a bank insured by the Federal Deposit Insurance Corporation payable to the Lafourche Parish School Board. The successful bidder shall be required to furnish the owner with a performance bond for 100% of the contract amount prior to the issuance of a contract to perform the work. No bid maybe withdrawn for a period of 30 days after receipt of bids. The time of completion of this project is prime importance. All of the work required shall be completed within one hundred twenty (120) calendar days from the Notice to Proceed. Should the Contractor neglect, refuse to complete the work or obtain approval from the State Fire Marshal's Office for occupancy on the date above, the Owner shall have the right to deduct from and retain out of such moneys which may be due or which may become due and payable to the Contractor, the sum as indicated in Paragraph 9.2 of the Instructions to Bidders per calendar day for each and every day that such completion of the work is delayed beyond the prescribed dates, as stipulated damages and not as a penalty. If the amount due and to become due from the Owner to the Contractor is insufficient to pay in full any such stipulated damages, the Contractor shall pay the Owner the amount necessary to the effect such payment in full. Provided, however that the Owner shall promptly notify the Contractor in writing of the manner the amount retained, deducted, or claimed as stipulated damages was computed. Bids must be submitted on the Louisiana Uniform Public Works Bid Form furnished with the Bidding Documents. Bid sheets will be issued only to contractors and/or subcontractors licensed in accordance with the provisions of L.R.S. 37:2150 through 2173 of the Louisiana Legislature. Contractors desiring to bid shall submit their Louisiana Contractor's License Number as evidence that they hold a license for BUILDING CONSTRUCTION that is in full force and effect. The architect shall pass around a sign-in sheet prior to beginning the formal presentation. The sign-in sheet shall be collected by the architect prior to the commencement of the presentation and shall announce that the contractors shall be expected to stay for the entire meeting. Contractors are advised to arrive at the meeting location in sufficient time to attend the entire meeting. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |