Similar Projects
Last Updated | 04/04/2019 11:53 AM |
Project Title | HVAC Install Campbell Museum |
Physical Address | View project details and contacts |
City, State (County) | Clemson, SC 29634 (Pickens County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remove and replace two outdoor heat pumps, two air handling units, two auxiliary heat strip modules and all associated control wiring and line sets at Campbell Museum, 241 Epsilon Zeta Drive, Clemson University, SC 29634. 1. Replace two existing 7.5-ton carrier heat pump split systems, Outdoor units, air handling units and auxiliary heat strips modules. 2. Replace existing control wiring for every component in these systems (outdoor to indoor and to thermostat) and install new digital thermostats. 3. Replace existing line sets and armaflex insulation and provide and install appropriate hangers for said line sets. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |