Similar Projects
D7 Olney Maintenance Yard Liquid Asphalt Storage Tank
Infrastructure
Bidding
$70,000 CJ est. value
Olney, IL 62450

17th Street and Boot Camp Water Tank Repairs and Repaint
Renovation
Bidding
$915,000 CJ est. value
Murphysboro, IL 62966

Fuel Tank Removal and Replacement
Post-Bid
Waukegan, IL 60087

Gallon Double Ellipse (Division Street) Exterior Overcoat, Mixer Installation, and Misc. Repairs
Post-Bid
Mundelein, IL 60060

New Ground Water Storage Tank
New Construction, Demolition
Results
Loda, IL 60948

Southwest Tank Rehabilitation
Results
Belvidere, IL

Sodium Bisulfite Storage Tank Replacement
Renovation
Bidding
$550,000 CJ est. value
Chicago Heights, IL 60411

Test and Repair Underground Storage Tanks
Term Contract
Post-Bid
Chicago, IL

Elevated Water Storage Tank
Results
Grayslake, IL

Underground Storage Tank Replacement
Renovation
Bidding
$1,000,000 CJ est. value
Urbana, IL 61802

H335--Underground Storage Tank Inspection and Maintenance Services
Term Contract
Post-Bid
Hines, IL 60141

Briar Lane Elevated Water Storage Tank Maintenance and Repainting
Infrastructure
Results
Less than $564,800 est. value
Oak Forest, IL

Water Tower Rehabilitation
Renovation
Bidding
$40,000 CJ est. value
Pecatonica, IL 61063

Logistics FY22 Underground Storage Tank Inspections-JTR
Alteration
Post-Bid
Springfield, IL

Phase V System Improvements Elevated Water Storage Tank Contract "L"
Alteration
Results
Less than $1,050,000 est. value
IL

Last Updated 09/09/2022 01:33 AM
Project Title

North Shore Water Reclamation District Administration Building Hot Water Pipe and Shutoff Valve

Physical Address View project details and contacts
City, State (County) Gurnee, IL 60031   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of removing and replacing approximately 45 feet of 3/4" copper pipe and insulation for the hot water tank in the Administration Building basement. A shutoff valve shall be installed on the line.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents