Similar Projects
SR 52 / US 82 at Little River and Overflow - Bridge Rehab
Infrastructure
Design
$1,000,000 CJ est. value
Tifton, GA 31793

SR 52 / US 82 at Little River and Overflow - Bridge Rehab
Infrastructure
Design
$1,000,000 CJ est. value
Tifton, GA 31793

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Natural Gas Main Improvements to Serve Orgill
Infrastructure
Bidding
$125,000 CJ est. value
Tifton, GA 31794

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Commerce Way Redevelopment Project
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Tifton, GA 31794

6.700 Miles of Milling, Inlay and Plant Mix Resurfacing on SR 520 Beginning West of the Worth County Line and Extending East of Salem Church Road
Infrastructure
Results
Tifton, GA 31793

Main Lane Improvements
Infrastructure
Results
$175,000 est. value
Tifton, GA

RFQ Contractor - USDA ARS Laboratory at Tifton
New Construction, Infrastructure - 46,008 SF
Post-Bid
$100,000,000 CJ est. value
Tifton, GA 31793

FY2021 TSPLOST Resurfacing Project
Infrastructure
Results
$900,000 est. value
Tifton, GA

Len Lastinger Elementary School Renovations
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Tifton, GA 31794

Old Ocilla Road Turn Lane Modifications and Bowen Road Improvements
Infrastructure
Results
$282,764 CJ est. value
Tifton, GA 31794

Adams Road Culvert Improvements
Infrastructure
Post-Bid
$80,000 CJ est. value
Tifton, GA 31733

Water, Sewer and Street & Drainage Improvements to serve the West Phillipsburg Community
Infrastructure
Results
$6,719,579 CJ est. value
Tifton, GA 31794

2022 and 2023 Local Maintenance Improvement Grant (LMIG) 2023 Addl. Local Maintenance Improvement Grant (LMIG)
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Omega, GA 31775

Last Updated 02/16/2023 09:46 AM
Project Title

New Road for Tift County Development Authority

Physical Address View project details and contacts
City, State (County) Tifton, GA 31794   (Tift County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of: NEW ROAD FOR: TIFT COUNTY DEVELPOMENT AUTHORITY consisting of approximately 13,140 SY of asphalt surface roadway, 4,165 LF of grading, and related items in accordance with Drawings, Specifications and other Contract Documents prepared by Harrell & Jackson Inc. PROPOSAL GUARANTY: A bid bond shall be required in the amount of 5% of the total bid amount. BONDS REQUIRED: A Contract Performance Bond and a Materials and Payment Bond will be required of the successful bidder. NO PROPOSALS WITHDRAWN: No submitted proposal may be withdrawn for a period of sixty (60) days after the closing time scheduled for the receipt of bids. OWNERS RIGHTS RESERVED: The Tift County Development Authority, hereinafter called the Owner, reserves the right to reject any or all Proposals and to waive any formality or technicality and to award the Proposal as may be in the best interest of the Owner, or re-advertise for bids. GUARANTY: The Contractor shall warrant all materials and labor for one year after the date of final acceptance by the Owner and the Engineer.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents