Similar Projects
Last Updated | 06/22/2020 07:39 AM |
Project Title | 7.2 MI of Hot Mix Asphalt Reconstruction on I-94 with Three Lanes in Each Direction; An Auxiliary Lane will be added on Eastbound I-94 between I-94Bl and I-196 |
Physical Address | View project details and contacts |
City, State (County) | (Allegan, Barry, Berrien, Branch, Calhoun, Cass, Kalamazoo, Saint Joseph Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Item No : 2006 801 Contract ID : 11016-130008 Control Sec : 11112, 11016 Job No : 205792A, 130008A Federal No : 1900759, 20A0461 Design Build Project: 7.2 mi of hot mix asphalt reconstruction on I-94 with three lanes in each direction; an auxiliary lane will be added on eastbound I-94 between I-94BL and I-196; acceleration/deceleration lengths will be improved on two ramps of the I-196 interchange, I-94BL will be reconstructed from a four lane divided to three lane roadway with a roundabout at the I-94BL and Crystal Avenue intersection; construction of 2 new bridges, 1 bridge replacement, 1 bridge rehabilitation and 2 bridge |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |