Similar Projects
Road Widening and Reconstruction Poinciana Boulevard
Infrastructure
Design
FL

Cold In-Place Bituminous Base Recycling with Asphalt Resurfacing
Term Contract
Bidding
$13,057,755 est. value
Orlando, FL

Roundabout/Milling and Resurfacing/Drainage Improvements/Base Work/Lighting
Infrastructure
Bidding
$8,318,065 est. value
Orlando, FL 32805

Pavement, Sidewalk, Curb and Gutter Repair Services
Post-Bid
Kissimmee, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

SR 417 Widening from John Young Parkway to Landstar Boulevard
Results
Less than $116,845,417 est. value
Orlando, FL 32824

Sealcoating Asphalt Areas Main Campus
Results
Kissimmee, FL 34741

Buena Vista Drive North - Median Closure
Construction
Orlando, FL 32800

SheltAir FBO Parking Lot Expansion
Addition
Construction
Orlando, FL 32803

Interchange (New)/Construct Interchange Ramps/Drainage Improvements/Bridge Repair and Rehabilitation
Renovation, Infrastructure
Bidding
$65,886,226 est. value
Orlando, FL 32885

Texas Avenue Roadway Improvements (from North of Duskin Avenue to South of Holden Avenue)
Infrastructure
Post-Bid
$20,485,221 est. value
Orlando, FL 32839

Resurfacing
Results
Less than $662,426 est. value
FL

Harmony Neighborhoods C-1 and C-2 Roadway Rehabilitation
Infrastructure
Bidding
$2,000,000 est. value
Saint Cloud, FL

Concrete and Asphalt Restoration Services
Infrastructure
Post-Bid
Orlando, FL

University Boulevard at Rouse Road Intersection Improvements
Results
$1,381,618 est. value
Orlando, FL 32800

Last Updated 05/26/2022 02:20 AM
Project Title

Primary Roads Asset Maintenance

Physical Address View project details and contacts
City, State (County) (Orange, Osceola Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,588,100
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This is an Asset Maintenance Contract for primary roads in Orange and Osceola Counties Section 0001 Asset Maintenance (Ls) 0999- 16- Partnering, Do Not Bid Ls 1.000 0999- 20- 1 Disputes Review Board, Meeting- Do Not Bid Da 1.000 E999- 10- 12 Asset Maintenance: Periodic Payments for Lump Sumcontract Ea 39.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents