Similar Projects
Construction of the Sevier SSD 1 - Box Culvert Rehabilitation Convulsion Canyon and Salina Creek
Post-Bid
Less than $245,000 est. value
Richfield, UT

Construction of the Vibration Dampening Trench
Post-Bid
Smithfield, UT

Ballard City Property Drainage Improvements
Results
Less than $51,000 est. value
Ballard, UT

Specialized Precast Concrete Box Culvert
Results

Ashley Upper and Highline Canals Rehabilitation Project/CMAR
Construction
Less than $34,000 est. value
UT

Reservoir Control Valve Project
Post-Bid
Kaysville, UT

Prince of Wales Reclamation
Results
Less than $50,000 est. value
UT

Goose Creek Fire Riparian and Stream Restoration
Post-Bid
Salt Lake City, UT

Construction of The Virgin River Stream Restoration Project
Results
Less than $1,116,310 est. value
Washington, UT

Mill Meadow Dam Rehabilitation Project
Post-Bid
Loa, UT

City Drain Crossing at Hunter Stables
Results
Salt Lake City, UT

Koosharem Town 2018 Chip Seal and Drainage Project
Post-Bid
Koosharem, UT 84744

Iowa String Box Culverts
Results
$500,000 to $1,500,000 est. value
UT

Sandy Canal Trail 10600 South to Dimple Dell
Post-Bid
Sandy, UT

Mountain View Elementary Drainage
Results
$200,000 to $300,000 est. value
Layton, UT

Reported 01/04/2019 12:00 AM
Project Title

White Rock Debris Basin Project

Physical Address View project details and contacts
City, State (County) UT   (Weber County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The Project generally consists of construction of a two-stage debris basin with total capacity of about 20 acre-feet representing 100,000 cubic yards of cut and 10,000 cubic yards of fill, for a net of 90,000 cubic yards of cut earthwork. The project will include clearing and grubbing, earthwork, piping/outlet works, placement of rip-rap, incidental concrete placement, installation of gate/fencing, tie-in to City storm drain, traffic control and reseeding
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents