Similar Projects
Orange Lake Associates RV Resort Park
New Construction, Infrastructure
Conception
Citra, FL

District Five Ocala Operations Center Asphalt, Mill, Overlay, Parking Lot Striping
Infrastructure
Design
$300,000 CJ est. value
Ocala, FL 34475

District Five Ocala Operations Center Asphalt, Mill, Overlay, Parking Lot Striping
Infrastructure
Design
$300,000 CJ est. value
Ocala, FL 34475

Tidal Wave Auto Spa / Belleview - Rebid
New Construction, Infrastructure - 3,120 SF
Bidding
$750,000 CJ est. value
Belleview, FL 34420

Tidal Wave Auto Spa / Belleview - Rebid
New Construction, Infrastructure - 3,120 SF
Bidding
$750,000 CJ est. value
Belleview, FL 34420

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

SE 100th St Resurface (SE 36th Avenue to US 301) and SE Campbell Road Resurface (US 301 to SE 59th Terrace Road/Oak Road)
Results
$484,000 est. value
Ocala, FL 34420

Resurfacing
Results
$17,327,268 est. value
FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Robinson Street and 107th Street Apartments
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Belleview, FL 34420

Culver's / Reddick
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Reddick, FL 32686

Highway 27 and 102nd Place Self Storage
New Construction, Infrastructure - 105,819 SF
Design
$11,000,000 CJ est. value
Belleview, FL 34420

Silver Springs Shores Youth Pool Marcite Resurfacing Project
Renovation, Infrastructure
Bidding
$50,000 CJ est. value
Ocala, FL 34472

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Last Updated 10/04/2022 01:33 AM
Project Title

Traffic Signals/ Add Right Turn Lane/ Drainage Improvements

Physical Address View project details and contacts
City, State (County) Ocala, FL 34475   (Marion County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,155,114 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Marion Road Name: Sr 25 (Hames Rd) Limits: At Us 441 Project(s): 44570115201(*) Federal Aid No: D522024B Total Roadway Length: 0.180 Miles Contract Days: 270 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.180 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Calendar Days The improvements under this contract consist of providing crash reduction counter measures at the intersection of SR 25 (Hames Rd.). The existing free flow right turn lane will be removed and replaced with a right turn lane. SR 500 will be widened to accommodate a 4' traffic separator. Milling, resurfacing, drainage structures, signing and pavement markings and mast arms are also a part of this project. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 011 - Traffic Signals/ Add Right Turn Lane/ Drainage Improvements

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents