Similar Projects
North Star Outdoor Storage
New Construction - 217,808 SF
Conception
$500,000 est. value
Meridian, Star, ID 83669

Public Storage - Ten Mile Road / Meridian
New Construction
Conception
$3,000,000 est. value
Meridian, ID 83646

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

37th Street and Shoup Avenue Bridges
New Construction, Infrastructure
Bidding
$392,000 CJ est. value
Boise, ID 83709

37th Street and Shoup Avenue Bridges
New Construction, Infrastructure
Bidding
$392,000 CJ est. value
Boise, ID 83709

Canyon Ridge Apartments
New Construction, Infrastructure
Sub-Bidding
$50,000,000 CJ est. value
Boise, ID 83716

The Everest Lot 1
Addition - 58,000 SF
Post-Bid
Boise, ID 83716

Saturn Way Storage Condos
New Construction - 1,495,284 SF
Post-Bid
$10,000,000 CJ est. value
Boise, ID 83709

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Widening SH-21 Between MP 0.787 and 3.023
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

Last Updated 11/17/2022 12:18 PM
Project Title

Vehicle Storage Building

Physical Address View project details and contacts
City, State (County) Eagle, ID 83616   (Ada County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Warehouse/Storage, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,230,994 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated cost: $600,000 - $800,000. . The Project contemplated is located within property limits owned by Eagle Sewer District at 100 South Urban Gate Avenue, Eagle, ID 83616, and generally consists of constructing a new CMU four-bay Vehicle Storage Building to house additional equipment and vehicles. Vehicle Storage Building is subordinate to the recently constructed Operations Building. Project includes construction of the new building, grading, drainage, site utilities, and re-establishment of an existing gravel road. The Work will be Substantially Complete within 210 calendar days from the date when the Contract Times commence to run. Each Bid must be submitted on the prescribed Bid Form and accompanied by Bid security as prescribed in the Instructions to Bidders. The Successful Bidder will be required to furnish the additional bond(s) and insurance prescribed in the Bidding Documents. To perform Work under these Bidding Documents, Bidders and Subcontractors shall be licensed as Public Works Contractors in accordance with Idaho Code 541902 and shall obtain and hold such other licenses as required by Federal and local Laws and Regulations. Bids will be accepted from those Bidders only who, prior to the Bid opening, hold current licenses as Public Works Contractors in the State of Idaho. For information concerning proposed Work, contact Travis Casch, travis.casch@jacobs.com or (208) 8678837. Owner's right is reserved to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents