Similar Projects
Jasper Trunk Sewer - Phase 3 - P21065 - City of Springfield
Infrastructure
Conception
$4,913,700 CJ est. value
Springfield, OR 97478

Jasper Trunk Sewer - Phase 3 - P21065 - City of Springfield
Infrastructure
Conception
$4,913,700 CJ est. value
Springfield, OR 97478

S. 28th Street Dust Mitigation (Springfield)
Infrastructure
Design
$1,289,156 CJ est. value
Springfield, OR 97477

S. 28th Street Dust Mitigation (Springfield)
Infrastructure
Design
$1,289,156 CJ est. value
Springfield, OR 97477

Dexter Fish Facility Upgrades Project
Infrastructure, Renovation
Bidding
$100,000,000 CJ est. value
Lowell, OR 97452

Dexter Fish Facility Upgrades Project
Infrastructure, Renovation
Bidding
$100,000,000 CJ est. value
Lowell, OR 97452

Camas Ridge Community Elementary School
New Construction, Demolition, Infrastructure - 74,500 SF
Post-Bid
$17,000,000 est. value
Eugene, OR 97403

Valve and Fitting
Infrastructure
Post-Bid
Springfield, OR

East Thomas Street Waterline Replacement
Infrastructure
Results
$200,000 to $225,000 est. value
Coburg, OR 97408

Polk Street Water Main Replacement
Infrastructure
Results
$300,000 est. value
Eugene, OR 97408

YMCA / Eugene
New Construction, Infrastructure
Construction
$34,000,000 CJ est. value
Eugene, OR 97405

Microtel by Wyndham
New Construction, Infrastructure - 37,256 SF
Pending Verification
$12,000,000 CJ est. value
Florence, OR 97439

2022 Bond - Street Repairs - City of Eugene
Infrastructure
Conception
$61,200,000 CJ est. value
Eugene, OR 97401

Coburg Loop - N. Coburg Industrial Way
Infrastructure
Design
$499,877 CJ est. value
Fall Creek, OR 97438

River Road at Irving Road
Infrastructure
Bidding
$2,200,000 CJ est. value
Eugene, OR 97404

Last Updated 12/21/2022 06:07 AM
Project Title

Wastewater Rehabilitation Harlow Cleanouts

Physical Address View project details and contacts
City, State (County) Eugene, OR 97401   (Lane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,078,843 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

104 FT 6 Inch PVC Pipe; 470 FT 8 Inch PVC Pipe; 1 EA Install Concrete Wastewater Manhole; 203 EA Cleanouts on Existing Pipe All work must be completed by September 15, 2023 The Agency reserves the right to issue Addenda making changes or corrections to the Plans, Specifications or quantities. The Agency will provide Addenda only by publishing them on the OregonBuys website. (See 00110.05(e)). No additional notification of addendum issuance will be provided. A Bid guaranty is not required for this project. Filing of a qualification questionnaire before bidding will not be required. Contingent or conditional bids will not be considered for acceptance. No bid will be received or considered unless the bid contains a statement by the bidder that provisions of ORS 279C.800 to 279C.870. This project is a public works improvement project and is subject to ORS279C.800 to 279C.870 Bidders are required to submit a first-tier subcontractor disclosure form, substantially as described in ORS 279C.370, within two working hours ofthe bid closing date and time No bid will be accepted by the City unless it contains a statement by the bidder as a part of the bid that the bidder in carrying out the contract will comply with all applicable laws. The City of Eugene is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the City of Eugene is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations The City may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids or to waive any specification or requirement upon a finding of the City that it is in the public interest to do so. For more information regarding this project, contact Jennah Maier at 541-852-2227 or jmaier@eugene-or.gov The estimated project cost range is $750,000 - $1,050,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents