Similar Projects
RR-21-4827 Tri-State Tollway (I-294) Pavement Rehabilitation
Infrastructure
Bidding
IL

(10-Mile) Standard Overlay and ADA Improvements
Infrastructure
Bidding
Waukegan, IL

2021 Patrol 1 Maintenance
Post-Bid
Libertyville, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

2020 Road Maintenance
Results
Long Grove, IL 60047

Holdridge Avenue Culvert
Results
Winthrop Harbor, IL 60096

2022 Road Program
Infrastructure
Bidding
$450,000 est. value
Deer Park, IL 60010

Washington Street Resurfacing
Renovation
Post-Bid
IL

2020 Road Maintenance
Results
Riverwoods, IL 60015

Class B Patching, Class D Patching, Crack Filling of a Concrete Roadway, Striping Replacement, Curb and GutterRemoval and Replacement
Post-Bid
IL 60089

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

Il Route 43 At Westleigh Road Intersection
Term Contract
Post-Bid
Lake Forest, IL 60045

Precast Concrete Pavement and Class B Concrete Patches
Results
Buffalo Grove, Long Grove, Vernon Hills, IL 60089

2021 Road Program Forest Knoll Drainage Improvements
Post-Bid
Libertyville, IL

Designed Overlay, ADA Improvements
Results
Barrington, IL

Last Updated 01/10/2022 04:33 PM
Project Title

2021 Road Program

Physical Address View project details and contacts
City, State (County) Zion, IL   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work is officially known as “2021 Road Program” and further described as Full-Depth Reclamation – Base Stabilization, 8” (with Cement): This work consists of full-depth reclamation treatment, which consists of grinding 4 inches of asphalt, 8 inches of Full-Depth Reclamation – Base Stabilization, (with Cement), and replacing with 2 inches of surface course and 2.25 inches of binder course, PCC sidewalk removal and replacement and Detectable Warnings (ADA accessibility), Inlets Type A, valve box frames to be adjusted w/ new frames, Frames and Lids Type 1 Open Lid, curb and gutter removal and replacement, thermoplastic pavement markings, gas valves to be adjusted, HMA and PCC driveway removal and replacement, frame and lid adjustments (special)[for roadway structures during FDR/Binder Install], drainage and utility structure adjustments, structure rehabilitations, structure reconstructions, and all necessary restoration at the locations listed below: 22nd St. (Erza Ave To Gabriel Ave) Ezekiel Ave. (21st St. [Il Rte 173] To 23rd St.) Elisha Ave. (21st St. [Il Rte 173] To 24th St.) East Bethesda (21st St. [Il Rte 173] To 22nd St.) Shiloh Blvd. (Dowie Memorial Dr. To Emmaus Ave.) 19th St. (Garnett Ave . To Sheridan Rd.) Elim Ave. (29th St. To 30th St.) Ezra Ave. (28th St. To 30th St.) Lebanon Ave. (33rd St. To Carmel Ave.) Lebanon Ave. (Carmel Blvd. To 31st St.) Elizabeth Ave. (22nd St. To 24th St.)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents