Similar Projects
Lincoln Avenue South of Wascher Drive To South of Killarney - City of Urbana
Infrastructure
Conception
$1,930,550 CJ est. value
Urbana, IL 61801

Lincoln Avenue South of Wascher Drive To South of Killarney - City of Urbana
Infrastructure
Conception
$1,930,550 CJ est. value
Urbana, IL 61801

Champaign County Detention Center Expansion
Addition, Demolition, Infrastructure
Design
$3,000,000 CJ est. value
Urbana, IL 61802

SVPWD Lake of the Woods Pump Station Improvements
Infrastructure
Bidding
$250,000 CJ est. value
Mahomet, IL 61853

Wastewater Treatment Plant Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Mahomet, IL 61853

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Pug Paving and Seal Coat, Both Steel Slag and Chip Seal
Infrastructure
Results
Mahomet, IL

Parking Lot C-3 Improvements 2022
Infrastructure
Results
$200,000 est. value
Champaign, IL 61820

Indian Grocery Store
Renovation, Alteration - 5,100 SF
Construction
Champaign, IL 61820

Hotel Royer Tapestry Collection by Hilton
Renovation, Infrastructure
Construction
$8,693,115 CJ est. value
Urbana, IL 61801

Windsor Road Resurfacing
Infrastructure
Pending Verification
$300,000 CJ est. value
Urbana, IL 61801

Windsor Road Resurfacing
Infrastructure
Pending Verification
$300,000 CJ est. value
Urbana, IL 61801

Pennslyvania Avenue West Of Orchard Street Resurfacing To Race - City of Urbana
Infrastructure
Conception
$617,150 CJ est. value
Urbana, IL 61801

Prairie Pines Campground Acquisition
Infrastructure
Bidding
$1,550,000 CJ est. value
Rantoul, IL 61866

Reported 09/23/2023 12:00 AM
Project Title

New Runway 4 and 22 FAA PAPIs - Phase 2 Paving

Physical Address View project details and contacts
City, State (County) Savoy, IL 61874   (Champaign County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding,
Bids Due View project details and contacts
Estimated Value $468,425 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

New Runway 4 and 22 FAA PAPIs - Phase 2 Paving Region : 3 District : 5 Federal Project # 3170016TBD County(s) : Champaign IL Project # CMI 5112 Airport University of Illinois-Willard Sponsor University of Illinois City Savoy The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. 20 Calendar Days Questions not accepted as of September 12, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, September 01, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 05A - New Runway 4 and 22 FAA PAPIs - Phase 2 Paving

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents